Similar Projects
Milling 3/4 or To The Depth of Existing Concrete Pavement and Overlaying With 3/4
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
CO

2022 Annual Landside Pavement Rehabilitation
Infrastructure
Bidding
CO

Citywide Bike - Bike Lane Package 1
Post-Bid
$1,070,000 to $1,300,000 est. value
Denver, CO

R3 Culvert Lining
Post-Bid
Denver, CO 80204

Wq Reg High Line Canal (Construction)
Results
$1,050,000 to $1,300,000 est. value
Denver, CO

Culvert Repair
Results
Denver, CO 80204

Construction Management Services
Infrastructure
Bidding
CO

2021 Citywide Chip Seal and Crack Seal
Post-Bid
$4,000,000 to $4,400,000 est. value
Denver, CO

2020 General Civil On-Call Construction (SBE)
Results
Less than $5,000,000 est. value
Denver, CO 80202

Ledge Rock Center Public Improvements
Infrastructure
Bidding
CO

Asphalt and Concrete Paving and Street Restoration
Post-Bid
Denver, CO

East 64th Avenue and Denali Street Infrastructure Project
Results
Denver, CO 80202

Irrigation Culverts - Peak View Park
Infrastructure
Bidding
Lakewood, CO

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Design Services for 56th Ave. Widening - Peoria to Pena
Results
Denver, CO

Last Updated 02/01/2022 10:18 AM
Project Title

Roadway Erosion Control

Physical Address View project details and contacts
City, State (County) Denver, CO 80249   (Denver County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project seeks to make infrastructure improvements at three landside locations across DEN property for the purposes of mitigating erosion and improving stormwater quality. In addition to the below descriptions, the project scope will include, but is not limited to, light earthwork and grading, erosion control, concrete saw cutting, guardrail installation, and slope and ditch paving. 1. Site #1 includes curb and gutter installation along a 2,450-ft length of westbound Harry B. Combs Parkway between Robertsdale Street (FedEx Cargo entrance) and the entrance to Airport Resort Parking. 2. Site #2 includes curb and gutter and tensioned cable barrier installation along a 1,300-ft length of inbound Pena Boulevard that is immediately west of Gun Club Road. 3. Site #3 includes the replacement of a 120-inch concrete pipe with an 8'x10' box culvert at the Third Creek crossing under Gun Club Road, immediately south of 100th Avenue.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents