Similar Projects
Chemical Cleaning of Leachate Lines
Infrastructure
Bidding
GA

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Peachtree Corners Circle Median Plantings
Term Contract
Sub-Bidding
Peachtree Corners, GA 30092

Pest Control Products and Services
Term Contract
Post-Bid

On-Demand Installation Of New Gas Services On An As Needed Basis
Alteration
Post-Bid
Lawrenceville, GA

F. Wayne Hill WRC Membrane Building Improvements
New Construction
Results
Buford, GA 30519

Provision Of Security And Traffic Control At Various Gwinnett County Tag Offices On An Annual Contract
Alteration
Results
GA

2022 Mulching Services
Term Contract
Sub-Bidding
Snellville, GA 30078

Pressure Washing Services on an Annual Contract
Term Contract
Post-Bid
Lawrenceville, GA

FWHWRC and YRWRF Primary Clarifier Rehabilitation
Renovation
Results
$15,000,000 est. value
GA

Provision of Sanitary Sewer and Force Main Rehabilitation Program on an Annual Contract
Term Contract
Sub-Bidding
Lawrenceville, GA 30046

Painting and General-Purpose Maintenance Services on an Annual Contract
Term Contract
Post-Bid
Lawrenceville, GA 30046

US-78 Lanier Sewer Pump Station Decommissioning
Demolition
Post-Bid
GA

Rental of Portable Toilets on an Annual Contract
Term Contract
Post-Bid
GA

Annual Contract For Drinking Water Maintenance & Improvements
Alteration
Post-Bid
Buford, GA 30518

Last Updated 07/28/2022 06:06 PM
Project Title

Control System Integration Services under the Department of Water Resources (DWR) SCADA Conversion Program on an Annual Contract

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA 30046   (Gwinnett County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Service/Term Contracts, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall furnish all insurance, transportation, materials, supplies, parts, test equipment, instrumentation, apparatus, services, tools, project management, supervision, labor, technical knowledge, skills, and all things necessary to provide an Annual Contract for SCADA system integrator services.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents