Similar Projects
San Souci Road Elevation Design
Infrastructure
Design
WA

CRT5 Repair Construction
Alteration
Design
$1,000,000 est. value
WA

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Bidding
$130,000,000 CJ est. value
Issaquah, WA 98029

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Bidding
$130,000,000 CJ est. value
Issaquah, WA 98029

Heavy Civil General Contractor/Construction Manager Services for Atlantic Base Yard Refurbishment Project
Infrastructure
Post-Bid
$22,000,000 est. value
Seattle, WA 98134

Transit Facility Improvements Work Order
Infrastructure
Post-Bid
WA

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

SR 516 - Jenkins Creek to 185th Pl SE
Infrastructure
Results
Covington, WA 98042

Sand Point Way NE Mixed Use Building
New Construction, Infrastructure - 61,316 SF
Pending Verification
$22,600,000 CJ est. value
Seattle, WA 98105

Sand Point Way NE Mixed Use Building
New Construction, Infrastructure - 61,316 SF
Pending Verification
$22,600,000 CJ est. value
Seattle, WA 98105

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 est. value
Bothell, WA 98011

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Bidding
$210,000 est. value

150Th Ave Se / Se 38Th St To Eastgate Way - Roadway Improvements
Infrastructure
Post-Bid
Bellevue, WA

124th Avenue NE- NE 12th Street to NE Spring Boulevard
Infrastructure
Results
$8,221,853 est. value
Bellevue, WA 98007

South Willow Street Multi-Residential Development
Demolition, New Construction, Infrastructure
Pending Verification
$60,000,000 CJ est. value
Seattle, WA 98118

Last Updated 08/01/2022 11:03 AM
Project Title

Overlay and Pavement Restoration 2022

Physical Address View project details and contacts
City, State (County) Bellevue, WA 98004   (King County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $846,486 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Engineers estimate range is between $640k to 960k. BID NO. 22030 sealed bids will be received by the City of Bellevue, Washington, for: Overlay and Pavement Restoration 2022 BID NUMBER: 22030 Work contemplated to be performed under this contract is as follows: Grind and overlay approximately 20,000 square yards of existing asphalt pavement. Utility adjustments, raised pavement markers, channelization and other minor improvements. The City utilizes Builder's Exchange of Washington to post plans, specifications, addenda, plan holders lists and bid results for all public works projects. All documents pertaining to this project will be available at the City of Bellevue's website. Addenda may not be available or updated on any other website other than through the official plan holders list. SUPPLEMENTAL RESPONSIBLE BIDDER CRITERIA Supplemental Responsible Bidder Criteria will apply to this project, and are included in the Special Contract Information section, Item 17. In a timely manner, Bidders may request, in writing, that the City modify the supplemental criteria. The City reserves the right to modify or not modify the supplemental criteria in its discretion. The City shall issue an Addendum, prior to the Bid Due Date, should it modify the supplemental criteria. The City shall not modify the supplemental criteria after the Bid Due Date, therefore, Bidders are encouraged to discuss with the project manager immediately and before the Bid Due Date the relevancy of the supplemental bidder criteria. Any bidder determined to be not responsible based on these supplemental criteria may appeal the City's determination by providing additional information to the City within two 2 business days following receipt of the City's written determination that the bidder was determined not responsible. The City of Bellevue reserves the right to reject any and all bids and to waive irregularities and informalities in the bidding process. No bidder may withdraw their bid for a period of ninety (90) days after the date and time set for the opening thereof. The successful bidder must comply with the City of Bellevue equal opportunity requirements. The City of Bellevue is committed to a program of equal employment opportunity regardless of race, color, creed, religion, gender, age, national origin, pregnancy, genetic information, marital status, sexual orientation (including gender identity), or the presence of any sensory, physical, or mental disability. The City of Bellevue's is also committed to complying with Title VI of the Civil Rights Act of 1964, that provides "No person in the United States shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents