Similar Projects
Last Updated | 10/16/2023 07:33 AM |
Project Title | Drinking Water Testing Services |
Physical Address | View project details and contacts |
City, State (County) | Kansas City, MO 64106 (Jackson County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Work The successful Proposer shall incorporate the following minimum expectations, which may include, but are not limited to the items listed below Vendor will perform a Limited Lead in Drinking Water Screening utilizing initial first draw methods. A first draw sample is defined as the first water to come out of the tap after an 8-hour period of inactivity, but no more than 18-hours. In order to successfully accomplish sampling within this time frame, vendor will be requested to mobilize to each site, to locate the high priority water sources, to flush each water source that is to be sampled, and to attach appropriate signage to prevent others from using the source prior to the sampling event. 2. After each water source has been flushed and is within the required time frame (between 8 and 18-hours after flushing), vendor will return to each site (2nd mobilization) to collect the water samples. Questions Deadline: 10/20/2023 04:00 PM (CT) Point of Contact - The following individual shall provide clarification of the specifications for this RFP: Stacy Swenson, Director of Purchasing Purchasing Department 2000 NE 46th Street Kansas City, MO 64116 816-321-4450 The initial contract will span twelve (12) months following Notice of Award by the Board of Education, with the option to renew up to three (3) times, upon need, annual review of any change of pricing terms, or changes to Missouri State laws. Initial testing of all buildings shall be completed no later than January 31, 2024 The North Kansas City School District reserves the right to reject any and all responses, to waive technical defects in responses, and select the response that is deemed most advantageous to the District. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |