Similar Projects
Caliber Car Wash / Kennesaw
New Construction, Infrastructure
Conception
$700,000 CJ est. value
Kennesaw, GA 30144

2022 Coatings Program
Infrastructure
Design
$40,000 CJ est. value
Marietta, GA 30060

Noonday Creek Trail Extension FM SR 92 to Noonday Creek Park
Infrastructure
Design
Kennesaw, GA 30144

Lower Roswell Road Safety and Operational Improvements
Infrastructure
Bidding
$9,000,000 CJ est. value
Marietta, GA 30068

Philmont Estates Phase 1 and Lakewood Estates Water Main Replacement
Infrastructure
Bidding
$750,000 CJ est. value
Marietta, GA 30060

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Kennesaw Town Center Self Storage & Retail
New Construction, Infrastructure - 128,808 SF
Post-Bid
$20,000,000 CJ est. value
Kennesaw, GA 30144

Site Improvements at Durham Park and Taylor-Brawner Park
Infrastructure
Results
Smyrna, GA 30080

Downtown Improvements - Site and Roadway
Infrastructure
Results
$2,438,999 est. value
Smyrna, GA

Brownsville Road Mixed-Use Development
New Construction, Infrastructure - 12,000 SF
Pending Verification
$48,000,000 CJ est. value
Powder Springs, GA 30127

Kennesaw Crossing Storage
New Construction, Infrastructure - 138,000 SF
Pending Verification
$15,000,000 CJ est. value
Kennesaw, GA 30144

I-75 From 0.42 Mi N of CS 3905 / Allgood Road to SR 5 Conn
Infrastructure
Design
$6,000,000 CJ est. value
Marietta, GA 30060

White View Drive Water Main Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Acworth, GA 30101

Resurfacing of Eighteen (18) Streets of Various Lengths
Infrastructure
Post-Bid
Kennesaw, GA 30144

Scott Drive Sanitary Sewer Improvements
Infrastructure
Results
$1,816,390 CJ est. value
Austell, GA 30106

Last Updated 08/31/2022 10:04 AM
Project Title

Airfield Maintenance 2022

Physical Address View project details and contacts
City, State (County) Kennesaw, GA 30144   (Cobb County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Aircraft Hangar, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $632,634 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 31st, 2022 this project is pending an award decision. This project consists of the demolition of the existing maintenance building at the airport and construction of a new maintenance and storage facility on the same site.

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents