Similar Projects
St. Charles County Regional Airport - Construct Taxilanes
Infrastructure
Bidding
$75,000 est. value
Portage Des Sioux, MO 63373

Houston Memorial Airport
Infrastructure
Bidding
$300,000 est. value
Houston, MO 65483

Runway 12R-30L from Taxiway R to Taxiway G
Post-Bid
$15,079,000 est. value
Saint Louis, MO 63145

Rehabilitate Taxiway Alpha
Infrastructure
Post-Bid
Chesterfield, MO 63005

Rehabilitate Taxiway A
Infrastructure
Results
Kansas City, MO 64116

Terminal 2 Improvements Phase 2 - Lambert International Boulevard Intersection Improvements
Infrastructure
Results
$1,400,000 est. value
Saint Louis, MO 63145

Maintenance of Runway Weather Information System
Term Contract
Post-Bid
Whiteman Air Force Base, MO

Nevada Regional Airport (NVD) Project
Infrastructure
Results
$250,000 to $600,000 est. value
Nevada, MO

Reconstruct Southeast Taxiway and East Apron Taxilane: Additive Alternate Reconstruct Southwest Taxiway
Infrastructure
Post-Bid
Perryville, MO 63775

Primary Surface Obstruction Removal
Infrastructure
Results
Maryville, MO

MNAC Runway 18-36 Rehabilitation
Infrastructure
Post-Bid
Excelsior Springs, MO 64024

Runway 9-27 Pavement Repairs
Infrastructure
Results
Kansas City, MO 64153

Reconstruct Taxiway A - South Of Runway 13-31
Infrastructure
Post-Bid
Columbia, MO 65201

Crack Seal, Micro-Surface and Re-Mark Parallel Taxiway, Apron And Taxilanes
Infrastructure
Results
Cameron, MO

Reconstruct Taxiway B And Repair Select Apron Panels
Infrastructure
Post-Bid
$200,000 est. value
Cape Girardeau, MO 63701

Last Updated 05/24/2022 07:53 AM
Project Title

Rehabilitate Runway And Connecting Taxiway, Install Runway Edge Lights, REILs And PAPIs

Physical Address View project details and contacts
City, State (County) Cuba, MO 65453   (Crawford County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate the runway and connecting taxiway pavement, replace runway edge lighting, wind cone, REILs and PAPIs, and construct new electrical vault building at the Cuba Municipal Airport.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents