Similar Projects
Extra Space Storage
New Construction - 1,350 SF
Conception
Payson, UT 84651

Riverview Plaza & Townhomes
New Construction - 46,114 SF
Conception
$10,000,000 CJ est. value
Saratoga Springs, UT 84045

Vistas at the Point
New Construction - 249,200 SF
Design
$10,000,000 CJ est. value
Lehi, UT 84043

Marketplace At Eagle Mountain Town Center
New Construction - 45,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Eagle Mountain, UT

BYU Lavell Edwards Stadium Concession Roof Replacement
Renovation - 13,863 SF
Post-Bid
Provo, UT 84604

Dominion Energy Springville Weld Shop
Renovation - 1,950 SF
Post-Bid
Springville, UT 84663

Office Remodel and Build Out
Renovation, Build-Out
Results
Orem, UT 84058

DFCM Construction - Pre Qualified General - Mtech Provo Office Remodel Phase 2
Results
$1,300,000 est. value
Provo, UT 84601

Rose Clinic
Renovation - 6,407 SF
Construction
Orem, UT 84097

Sporkland Office Tower
New Construction - 151,592 SF
Construction
$15,000,000 est. value
American Fork, UT

Mountain Tech South Lot 5
New Construction - 389,377 SF
Pending Verification
$10,000,000 CJ est. value
Lindon, UT

Lindon OW Building 2
New Construction - 74,861 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Lindon, UT

Vista View Commercial
New Construction
Design
Spanish Fork, UT 84660

BSA Orem Office
Renovation - 5,500 SF
Post-Bid
Orem, UT 84057

Novolab TI - Wagner Building
Renovation - 2,050 SF
Construction
Lehi, UT 84043

Reported 07/14/2021 11:52 AM
Project Title

Dfcm Construction-Vbs Construction-Uvu Institutional Advancement Center

Physical Address View project details and contacts
City, State (County) Orem, UT   (Utah County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Convention/Exhibit Center, Office
Contracting Method
Project Status Construction Commenced July 2021
Bids Due View project details and contacts
Estimated Value $9,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project site is located on the North edge of UVU’s main campus, on the North side of 800 South, between an existing parking lot and the Center for Autism. Two existing residential structures will be demolished prior to new construction as part of this scope of work. The new steel-framed/brick veneer building includes three major building components: 1. A two-story office building (approx. 24,000 sf) for the Institutional Advancement Program. 2. A new one-story Event Center (6,400 sf) 3. A double height lobby space connecting the two components. New site development around the building features a South plaza and North plaza in addition to a small loading area. Additionaly a stand alone storage structure is to be provided.

Details

,, 30,400 SF - 1 Office, 2 Stories Above Grade, Approximately 24,000 SF New Construction, Building, 1 Convention/Exhibit Center, 1 Story Above Grade, Approximately 6,400 SF New Construction, Building.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Loading Dock Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Site Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents