Similar Projects
Last Updated | 02/05/2021 12:18 PM |
Project Title | N041--Air Curtains Remove and Install West Palm Beach Medical Center |
Physical Address | View project details and contacts |
City, State (County) | Riviera Beach, West Palm Beach, FL 33410 (Palm Beach County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The West Palm Beach VA Medical Center located at 7305 N Military Trail, West Palm Beach, FL 33410 has a requirement to provide all labor, tools, material, and equipment necessary for a contractor remove existing Air Curtains and install new larger capacity Air Curtains at both sides of the employee entrance on the east side basement of the Medical Center. Contractor to install new air curtains at the Main Entrance of the Medical Center, east side. SCOPE OF WORK This is to provide all labor, tools, material, and equipment necessary for a contractor remove existing Air Curtains and install new larger capacity Air Curtains at both sides of the employee entrance on the east side basement of the Medical Center. Contractor to install new air curtains at the Main Entrance of the Medical Center, east side. Specific scope of the project is listed below. Work will be performed at West Palm Beach, Veterans Affairs Medical Center, 7305 N. Military Trail, West Palm Beach, FL. II. REQUIREMENTS The contractor shall furnish all Supervision, site safety and oversite for the following: Remove existing two (2) air curtains in the basement east employee entrance and install two new industrial air curtains. Air curtains to be 72 wide each, minimum 2700 CFM. Work will include necessary electrical work to power the new air curtains and tie into existing Horton Automatic Door Openers. Contractor may use existing conduit run to the air curtains, however, will be responsible for properly sizing breaker and wire. Add air curtain in east entrance of the Main Hospital. Air curtain to be 96 wide, minimum 2800 CFM. Work will include installation of all new necessary electrical work from nearest electrical panel within the main building to the installation site to power the new (Non preexisting) air curtain as well as tie into existing automatic doors (Stanley) at Main entrance. Contractor may use existing conduit if available. However, will be responsible for properly sizing breaker, conduit and wire. Contractor shall completely prepare the site for this project, including implementation of dust control and other construction safety measures, and furnish labor, materials and equipment necessary to complete all work which includes but not limited to verification of proper operation of existing equipment. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |