Similar Projects
Susan Campbell Sidewalk Improvement Project
Infrastructure
Bidding
Eugene, OR 97403

Klamath, Lake and Deschutes County Curb Ramps Project
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value

Dirksen Nature Park Trail and Parking Lot Improvements
Infrastructure
Post-Bid
Tigard, OR 97223

Clinton Avenue Parking Lot at Peterson Elementary School
Infrastructure
Post-Bid
Klamath Falls, OR 97603

2021 Sidewalk Safety Program
Infrastructure
Results
$146,720 est. value
Corvallis, OR 97333

US101: Bunker Hill Sidewalks and Flanagan Signal Project on the Oregon Coast Highway
Infrastructure
Results
OR

US395: Sidewalk Improvements (John Day) Project
Infrastructure
Bidding
$1,000,000 to $2,000,000 est. value
OR

NW 174th Ave Sidewalk Infill - NW Santiam Dr to NW Sandpines Ln
Alteration
Results
$100,000 to $200,000 est. value
OR

Museum of the Oregon Territory Parking Lot Repair
Infrastructure
Results
$115,000 est. value
OR

Parking Lot Asphalt at SRCI
Infrastructure
Results
Ontario, OR 97914

SAFE SSMP FY21 Improvement Project
Infrastructure
Results
$3,056,000 to $3,565,000 est. value
Milwaukie, OR

R4 Headquarters Empire Avenue Driveway Landing
Infrastructure
Results
OR

ADA Ramps Fischer and Roshak Multiple Locations
Infrastructure
Results
$1,000,000 to $1,500,000 est. value
Hillsboro, OR

ADA Ramps South West Farmington Road Multiple Locations
Infrastructure
Results
$750,000 to $1,500,000 est. value
Beaverton, OR 97003

I-5 /OR99/OR238/US199/OR62/OR140 - Curb Ramps Project Various Highways
Infrastructure
Results
$2,000,000 to $5,000,000 est. value

Last Updated 12/10/2021 05:29 AM
Project Title

US20/OE228 Curb Ramps (Sweet Home) Project

Physical Address View project details and contacts
City, State (County) OR   (Linn County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Req. approx. 840 hr training; 1,300 ft2 temp sign; 3 ea PCMS; 1,100 hr flag; 6 ea flag sta light; 4,850 ft temp remvl tape; 4,400 ft2 bar remvl; 720 ft ped channel dev; 44 ea temp curb ramp; 83 ea inlet protect; 110 ft sed barr; 650 ton contam soil disp; 9,000 gal cont water disp; 9,800 yd2 rem curb ramp, walk, curb, surf; 10,000 ft asph saw cut; 275 ft vid insp; 308 ft pipe; 25 ea adjst boxes; 67 ea adjst inlet; 11 ea minor adjst manhole; 132 ft2 retain wall; 4,900 ton aggr base; 1,300 ton ACP; 20,000 ft2 extr pvmnt repair; 20 ea asph appr; 500 ft2 asph slope pave; 11,635 ft curb; 500 ft2 conc island; 6,500 ft2 conc drvway; 53,000 ft2 conc walk; 245 ea curb ramp; 3,000 ft2 trunc dome; 1,300 durbl grout rock; 770 ft pvmt paint; 3,850 ft2 pvmt bar; 195 ft2 sign; 75 yd3 soil; 190 yd2 sod lawn; 1,200 ft2 weed cntrl geotext; 95 ft handrail.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents