Similar Projects
Castle Pines Parkway Reconstruction Project Monarch Boulevard to Yorkshire Drive
Bidding
Castle Pines, CO 80108

Providence Village Rec Center Landscape and Site Civil Improvements
New Construction
Post-Bid
Highlands Ranch, CO

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

2020 Townwide Resurfacing Program
Results
$300,000 to $400,000 est. value
Parker, CO

Plum Creek Parkway Roadway Widening and Roundabout Improvements Phase 1B
Results
Less than $6,878,487 est. value
Castle Rock, CO

Statewide Asphalt
Post-Bid

2020 Asphalt Overlay Project
Results
Less than $10,002,306 est. value
Castle Rock, CO 80104

Crooked Stick Traffic Signal and Widening Project - Phase 1
Post-Bid
Lone Tree, CO 80124

2020 Slurry Seal Project
Results
Less than $1,742,825 est. value
Castle Rock, CO 80109

2020 Median Rehabilitation
Post-Bid
Lone Tree, CO

2020 Meadows Boulevard and Prairie Hawk Drive Reconstruction Project
Results
Less than $3,152,271 est. value
Castle Rock, CO 80109

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

2020 Crack Seal and Mastic Project
Results
$160,943 est. value
Castle Rock, CO 80109

Woodmoor Mountain Road Projects
Post-Bid
CO

2020 Townwide Diamond Grind and Joint Seal Program
Results
$500,000 to $600,000 est. value
Parker, CO 80138

Last Updated 01/18/2021 05:19 PM
Project Title

2021 Asphalt Overlay

Physical Address View project details and contacts
City, State (County) Castle Rock, CO   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $3,987,537
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract includes removal and replacement of existing concrete including concrete pavement, crosspan, sidewalk, curb and gutter, curb ramps, asphalt patching, various depths and types of milling of existing asphalt pavement, and various thicknesses of asphalt paving within the streets listed in the Appendices or as directed by the Project Manager. The Contractor shall supply all labor, equipment, and materials necessary to complete the work in accordance with these specifications. The contract shall be awarded based on bids received for the base bid schedules (A&B) and the contract documents. Night work shall be required and entail asphalt patching, asphalt milling, and asphalt overlay on New Memphis Court, between Factory Shops Blvd. and Outlet Access Gate, New Beale Street, from Hwy 85 to Factory Shops Blvd and Front Street from Flyover Bridge to 5th Street. All locations shall be completed before June 25, 2021. Contractor will be required to coordinate construction activities with adjacent businesses, trash removal companies, school district, HOA, Metro Districts, and other Town maintenance projects if applicable.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents