Similar Projects
HVAC Contractor
Alteration
Bidding
Moab, UT

HVAC Controls
Alteration
Bidding
Cedar City, UT

Canyonlands Field Airport Upgrade to Terminal Building Roof Top Units
Post-Bid
Moab, UT 84532

SLCC TRC CT Dust Collector
Post-Bid
Salt Lake City, UT 84130

Residential HVAC Services
Term Contract
Results
Salt Lake City, UT 84114

HEB Southeast Tower Fume Hood Upgrade
Results
$1,521,698 est. value
Salt Lake City, UT 84112

DFCM BCRC Cadaver Lab Redundant HVAC
Term Contract
Bidding
$94,567 est. value
Brigham City, UT 84302

Kanab Center Foundation Venting
Post-Bid
Kanab, UT 84741

Performing Arts Building HVAC Upgrade - Design/Build
Results
Salt Lake City, UT 84112

Fire Station Hot Water System Re-Pipe
Post-Bid
Riverton, UT 84065

HVAC Unit Replacement for Lakeview Academy
Results
Saratoga Springs, UT 84045

Weatherization Assistance Program
Post-Bid
Orem, UT 84097

MSB HVAC Maintenance for Residential Housing and Education
Term Contract
Results
Salt Lake City, UT 84112

Department of Labor - Combustible Dust Chambers
Post-Bid
Sandy, UT

DFCM Construction - Mechanical Contractors - Camp Williams Building 3030 HVAC
Results
$120,000 est. value
Bluffdale, UT 84065

Reported 10/12/2021 11:46 AM
Project Title

Germicidal UV Installation

Physical Address View project details and contacts
City, State (County) Orem, UT   (Utah County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

High Output Germicidal UV-C Installation UV-C lamps must operate in the 100-280 nanometer (nm) range. The Contractor will install all coil mounted UV-C lighting assemblies in the building air handling units per the factory installation specifications. Electrical services will need to be completed by a licensed electrian. Before each UV-C installation, the Contractor will produce the appropriate charts and graphs, lamp location and quantity, irradiance, and mounting configurations for review by UVU and installation contractor.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents