Similar Projects
Pavement Resurfacing
Infrastructure
Bidding
$7,500,000 est. value
NY

Pavement Rehabilitation, Ny Route 590, Blossom Road to Titus Avenue and Ny Route 104, Culver Roar To The Irondequoit Bay Bridge
Infrastructure
Bidding
$930,000 est. value
NY

Highway Preventive Maintenance Program 8
Post-Bid
Rochester, NY 14614

Curb Modifications and Concrete In-Fill at RTS Transit Center
Infrastructure
Post-Bid
Rochester, NY 14604

Cottage-Magnolia Street Rehabilitation
Results
Less than $2,561,000 est. value
Rochester, NY 14614

East Main Street Reconstruction - North Goodman Street to Culver Road
Results
Less than $7,770,000 est. value
Rochester, NY 14614

Design for Driveway Renovation at Pierce IRA
Infrastructure
Post-Bid
Less than $50,000 est. value
Webster, NY 14580

Rte 286 Intersection Improvements
Results
Less than $1,700,000 est. value
Penfield, NY 14526

Design for Driveway Renovation at Brooklawn IRA
Infrastructure
Post-Bid
Less than $50,000 est. value
Rochester, NY 14618

Lake Road Phase II Improvements
Results
Less than $6,400,000 est. value
Rochester, NY 14614

Salt Road Rehabilitation
Infrastructure
Post-Bid
Webster, NY 14580

6.7 Miles of Asphalt Concrete Resurfacing and Preventive Maintenance on I-490
Results
Brighton, Perinton, Pittsford, NY 14450

Weaver Street Rehabilitation Project
Infrastructure
Post-Bid
$2,280,000 est. value
Rochester, NY 14621

2021 Highway Maintenance Project
Term Contract
Results
Rochester, NY 14600

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Reported 02/02/2022 12:00 AM
Project Title

2022 Milling and Resurfacing

Physical Address View project details and contacts
City, State (County) Rochester, NY   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,928,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

East Avenue between E. Main Street and Alexander Street, Chestnut Street / N. Chestnut Street between E. Broad Street and E. Main Street, N. Goodman Street between Peck Street and Bay Street, and N. Goodman Street between Clifford Avenue and the City Line. Milling and resurfacing of the pavement surface, repair of defective sidewalk and curb, curb ramp improvements, installation of curb bump-outs, adjustment of and repairs to manholes, catch basins, and valve boxes, installation of traffic signal back plates, painting of traffice signal poles, replacement of street lighting poles and pedestrian lights, and installation of new pavement markings and signage.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents