Similar Projects
Copperleaf Water Quality Pond J Improvements
Post-Bid
$450,000 to $625,000 est. value
Aurora, CO

High Point PD1 Pond Project
Infrastructure
Post-Bid
Denver, CO

Groundwater Recharge Ponds Pilot Project
Results
Thornton, CO

Quincy Intertie Improvements
Results
$7,400,000 to $8,400,000 est. value
Aurora, CO

48th Avenue Grading Project
Infrastructure
Post-Bid
Aurora, CO

152nd Avenue and Imboden Road Drainage Improvements
Results
CO

Box Elder Infrastructure Project Phase I
Infrastructure
Post-Bid
Aurora, CO

South Platte Bank Stabilization
Results
$1,830,000 to $2,200,000 est. value
Aurora, CO

Reunion Pond Maintenance
Infrastructure
Post-Bid
Commerce City, CO

Reunion Center Stead School Phase District: Reunion Center Metropolitan District No 1
Results
Commerce City, CO 80022

Rec Center Pond Liner
Infrastructure
Post-Bid
Brighton, CO 80602

124th Reservoir Riprap Erosion Protection Construction Project
Results
Brighton, CO

112th and Irma Drive Drainage Improvements
Results
$200,000 to $300,000 est. value
Northglenn, CO 80233

CM/GC Services for 2021-2024 Rampart 54 PCCP Sliplining Rehabilitation Program
Results
Aurora, CO

Broadway and 62nd Avenue Minor Drainage Improvements
Infrastructure
Results
Brighton, CO

Last Updated 03/01/2022 12:21 PM
Project Title

Underground Drainage Pipe Cleaning

Physical Address View project details and contacts
City, State (County) Thornton, CO   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Underground Drainage Pipe Cleaning. Thornton has several drainage pipes that will need periodic cleaning. In addition, new drainage systems may be added to Thornton’s infrastructure system. There are three (3) existing major underdrain systems at this time. The underdrain system located on the east and southeast side of Tani Gravel Lake is approximately 1,820 feet of 18-inch slotted PVC and 300 feet of 15-inch slotted and solid PVC. The system located at East Sprat Platte pit is approximately 1,875 feet of 15-inch slotted and solid PVC piping. The system located near E470 (Hammer Reservoir Complex) and Riverdale Road is approximately 1,800 feet of 8-inch slotted PVC.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents