Similar Projects
SB267 Replace Chiller and Chilled Water Loop - Downtown Capitol Complex
Post-Bid
$2,100,000 est. value
Denver, CO

Heating, Air Conditioning, Ventilation Maintenance and Repair Services
Term Contract
Post-Bid
Aurora, CO 80012

AHU Project at Denver Air Route Traffic Control Center for HVAC Contractor
Results
$200,000 to $300,000 est. value
Longmont, CO

As-Needed HVAC, Mechanical and Plumbing Services
Term Contract
Results
Aspen, CO 81611

Install an Air Conditioning at the Courthouse and Administration Building
Post-Bid
CO

Notice 20-01-Rfp-Umc-Bldg-Recommissioning
Results
Less than $800,000 est. value
Boulder, CO

J041--OCC-Data Center A/C Repairs Pop: 09-25-2020 To 09-24-2021
Post-Bid
Denver, CO 80209

HVAC Scheduled Service Agreement
Term Contract
Results
Rangely, CO 81648

Water Heater Replacement in Module "F" and Laundry at the Detention Facility
Alteration
Post-Bid
Brighton, CO 80601

Warehouse Evaporative Coolers Install
Results
Less than $50,000 est. value
Loveland, CO 80537

CU Denver PN20-112394 - SCPP Only
Alteration
Post-Bid
$125,000 est. value
Denver, CO 80204

Parker Town Hall Chiller Replacement
Results
Parker, CO 80138

Multi School Exhaust Fan Replacement
Infrastructure
Post-Bid
Denver, CO 80223

Dental School Improve Exhaust Fan EF-2 on Roof
Results
Less than $176,510 est. value
Aurora, CO 80045

IT Server Room HVAC
Alteration
Post-Bid
CO

Last Updated 07/23/2021 02:16 PM
Project Title

HVAC System at Beech Preschool

Physical Address View project details and contacts
City, State (County) Cortez, CO 81321   (Montezuma County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor responsible for developing a design in accordance with plan review by District, Empire Electric and in adherence with state and local building codes. Consultation should be made with District regarding the presence of asbestos containing materials. Bid to include all labor, materials and equipment to: 1. Replace existing air handler with new energy efficient roof top unit to meet or exceed building square footage Central controls. 2. Replace existing gas furnaces with 2 new commercial gas furnaces 3. 2 new A/C units 4. All necessary plumbing & electrical hookups 5. Necessary permitting and line locates 6. Use certified asbestos-free components and materials 7. System training upon project completion 8. Adhere to manufacturer’s specifications for all phases of installation.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents