Similar Projects
Happy Hollow Park and Zoo Lower Zoo Electrical Improvements - City of San Jose
Alteration
Conception
San Jose, CA

Police Athletic League Stadium Electrical Improvements - City of San Jose
Renovation, Infrastructure
Conception
$2,220,000 est. value
San Jose, CA 95116

Repplier Park Camera Installation Project
Renovation
Design
$200,000 CJ est. value
Banning, CA 92220

Electric Transformers
Alteration
Post-Bid
Lompoc, CA 93436

Port of Oakland Remote Operations Upgrades
Alteration
Post-Bid
Oakland, CA 94607

NWRC PV System
Term Contract
Results
Los Banos, CA 93635

Fire Department Headquarters Generator
Alteration
Results
$570,000 est. value
Long Beach, CA 90802

Cubberley New Electrical Service
Renovation
Construction
$302,000 CJ est. value
East Palo Alto, CA 94303

Generators for Facilities - Corporation Yard - FC23PW05 - City of Napa
Alteration
Conception
$365,000 est. value
Napa, CA 94558

On-Call Lighting Repair Project 2022
Term Contract
Post-Bid
$100,000 CJ est. value
Fairfield, CA 94533

Preventive Maintenance Services on VA Owned Rec Solar Panels
Term Contract
Results
Los Angeles, CA 90073

CHP San Diego Area office - Generator Maintenance Services
Term Contract
Post-Bid
San Diego, CA 92123

Place Minor Concrete, Replace Irrigation and Electrical Facilities
Alteration
Results
$5,400,000 est. value
CA

Operation and Maintenance for City-Owned Solar Systems
Term Contract
Post-Bid
Santa Clara, CA

Transmission Line 7/8 Upgrades
Alteration
Results
$28,000,000 est. value
San Francisco, CA

Last Updated 02/13/2024 01:31 PM
Project Title

Civic Park Conduit Boring

Physical Address View project details and contacts
City, State (County) Hanford, CA 93230   (Kings County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $28,557 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bidders must be on the City's plan holders list to bid. Bore approximately 242 LF total in two bores and pull parallel 4 PVC conduits from beginning to end points detailed on the provided site plan. If there are any questions, please direct them to: Randy Shaw, Building Superintendent, City of Hanford, 321 N Douty St., Hanford, California 93230, (559) 585-2148, rshaw@cityofhanfordca.com. An executed copy of the contract and purchase order will be issued to the successful bidder that shall constitute acceptance of the Bidders Proposal. No bids will be accepted from a Contractor who has not been licensed in accordance with the provisions of Chapter 9, Division 3 of Business and Professions Code. The City reserves the right to reject any or all bids. In accordance with the provisions of Section 1770 to 1781 of the Labor Code, the City of Hanford has ascertained that the general prevailing rate of wages applicable to the work being done is as per wage scale on file in the City Engineers office. The Contractor to whom the contract is awarded shall pay not less than the specified wages to all workmen employed in the execution of the contract. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. In accordance with the provisions of Section 1770 to 1781 of the Labor Code, the City of Hanford has ascertained that the general prevailing rate of wages applicable to the work being done in Kings County is as per wage scale on file in the City Engineers office. The Contractor to whom the contract is awarded shall pay not less than the specified wages to all workmen employed in the execution of the contract. The (Title o(Recipient), in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US. C 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Construction Contracts under $25,000, and Maintenance Contracts $15,000 and under are from some prevailing wage requirements, including DIR registration, and DIR notification of award. Prevailing wage is required for any project over $1,000, and the Contractor is responsible for keeping certified payroll records. If the project does not fall within the EXEMPT limits, the Contractor must provide the DIR numbers of the prime and all sub contractors on the contract. The City will report the award of the project before the work begins, or up to 30 days after award, whichever occurs first. SCOPE OF WORK o Pothole alignment, determine install depths based on conflicts o Provide bore pits and fencing at locations shown per plans o Directional Bore approx. 260 LF in two runs, 36" min. cover o Provide and install parallel runs (2) 4" PVC Conduit SCH 40 with no less than 36" of cover from the point noted on the site plan to the termination of the existing 4" conduits already installed alongside the old County Courthouse also shown on the site plan, with capped ends and no connections o Pulls are from point to point with no other connections. o The 4" PVC Conduit SCH 40 (approx. 480') to be provided by the contractor and include any appurtenances. o Conduit lengths are estimates. It is the responsibility of the contractor to provide and install the correct length of conduit to reach each terminal point. o Termination point will be constructed near enough to connection points to allow the installation of Christy boxes. o Demobilization and repairs per punch. o Leave bore pits open with fencing for 2 weeks after project completions. Bore Pits to be filled by others

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents