Similar Projects
Murphy Express #8600 / Lubbock
New Construction, Infrastructure - 2,824 SF
Design
$2,500,000 CJ est. value
Lubbock, TX 79423

Creative Wealth Office
New Construction, Infrastructure - 4,200 SF
Design
$840,000 CJ est. value
Lubbock, TX 79424

SCADA System Improvements
Infrastructure
Bidding
$150,000 CJ est. value
Idalou, TX 79329

Frenship Independent School District - New High School
New Construction, Infrastructure
Sub-Bidding
$50,000,000 CJ est. value
Lubbock, TX 79407

14th Street Plaza and East Green Project
New Construction, Infrastructure
Post-Bid
$1,200,000 CJ est. value
Lubbock, TX 79401

New High School AgriSTEM Complex - Package 2
New Construction, Infrastructure
Post-Bid
$200,000 CJ est. value
Lubbock, TX 79416

Replacement Pumps, Motors and Starters for Pump Station No 4
Renovation
Results
Lubbock, TX

Oakridge Leasing Office New Building
Demolition, New Construction, Infrastructure - 2,112 SF
Pending Verification
$400,000 CJ est. value
Lubbock, TX 79424

Hurricane Beach Car Wash
New Construction, Infrastructure - 3,700 SF
Pending Verification
$1,000,000 CJ est. value
Lubbock, TX 79407

The Plaza Restaurant - Shell Only
New Construction - 6,600 SF
Design
$1,500,000 est. value
Lubbock, TX 79424

Agri-Stem Greenhouse at Anita Carmona-Harrison Elementary School
New Construction, Infrastructure
Post-Bid
$200,000 CJ est. value
Lubbock, TX 79415

Ricky Green Shop
New Construction, Infrastructure - 6,100 SF
Pending Verification
$350,000 CJ est. value
Lubbock, TX 79423

Southwest Garden Office Complex
New Construction, Infrastructure
Design
$2,260,000 CJ est. value
Lubbock, TX 79424

El Paso Clinical Science Building - Texas Tech University Health Sciences Center
New Construction, Infrastructure - 240,000 SF
Pending Verification
$101,700,000 CJ est. value
Lubbock, TX 79401

Toot n Totum - Lubbock
New Construction, Infrastructure - 6,767 SF
Design
$4,000,000 CJ est. value
Lubbock, TX 79424

Last Updated 08/26/2022 07:04 AM
Project Title

Shallowater Pump Station and Irrigation Improvements

Physical Address View project details and contacts
City, State (County) Shallowater, TX 79363   (Lubbock County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Lubbock County Director of Purchasing will accept sealed bids on the following: Shallowater Pump Station and Park Irrigation Improvements Bids shall be made on a stipulated sum basis. Selection will be based on best value for the Owner. Bid security in the sum of 5% of the Total bid amount and in the form of a cashier's check, certified check or Surety Bid Bond, shall accompany bids in accordance with the Instructions to Bidders. The Owner reserves the right to waive irregularities and to reject all bids. In accordance with the Instructions to Bidders, all bidders must comply with State Labor Laws concerning wage rates. Questions Due Date: Aug 25th 2022, 2:00 PM CDT

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents