Similar Projects
Pardeeville - Manchester Const/ Mill and Overlay
Infrastructure
Conception
$3,000,000 CJ est. value
Ripon, WI 54971

Pardeeville - Manchester Const/ Structure Replacement
Infrastructure
Conception
$1,000,000 CJ est. value
Ripon, WI 54971

Summit Automotive Vehicle Service and Repair
New Construction, Infrastructure - 11,485 SF
Design
$2,500,000 CJ est. value
Fond du Lac, WI 54937

Aurora Medical Center Fond du Lac
Addition, New Construction, Infrastructure - 70,000 SF
Design
$67,000,000 CJ est. value
Fond du Lac, WI 54937

Fond du Lac County - Restroom/Shelter
Demolition, New Construction, Infrastructure
Bidding
$550,000 CJ est. value
Fond du Lac, WI 54935

Rosendale - Oshkosh; STH 23 - CTH Ff, STH 026
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Brandon, WI 53919

Replace Pavement from I-43 to 8th Street, downtown City of Manitowoc - Calumet/Washington, C Manitowoc
Infrastructure
Post-Bid
$12,000,000 CJ est. value
Metomen, WI 54971

Road Work - Cold Mix, Paver Wedging and Hot Oil Seal Coating on Various Roads
Infrastructure
Post-Bid
$400,000 CJ est. value
Eldorado, WI 54932

Demolition and Site Clearance 45E Scott Street
Demolition, Infrastructure
Results
Fond du Lac, WI 54935

Fond Du Lac County - Riggs Park Splashpad Improvements
Renovation
Results
Fond du Lac, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Froedtert Health and ThedaCare
New Construction, Infrastructure - 18,000 SF
Pending Verification
$35,000,000 CJ est. value
Fond du Lac, WI 54935

Replace/Rebuild D Barn - Fond du Lac County
Demolition, New Construction, Infrastructure
Conception
$350,000 CJ est. value
Fond du Lac, WI 54935

Cold Mix Paver Wedging and Hot Oil Chip Seal Coating
Infrastructure
Design
$200,000 CJ est. value
Empire, WI 54937

Last Updated 02/08/2023 07:02 PM
Project Title

Plamore Park

Physical Address View project details and contacts
City, State (County) Fond du Lac, WI 54935   (Fond du Lac County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,448,568 [brand] Estimate
Plans Available from Agency's Affiliate - 10/17/22
Owner View project details and contacts
Architect View project details and contacts
Description

As of 02/08/2023 Source does not have the start and end date yet. The project quantities includes but are not limited to the following described approximate quantities of work: SCOPE OF WORK o Construction of a Miracle League Baseball Diamond o Construction of a Multi-Use Sport Court o Construction of a Parking Lot o Construction of a Concession Stand o Construction of a Retention Pond o Underground and Misc. Civil Work o Mechanical and Electrical Work No bid shall be withdrawn for a period of (30) thirty days after the opening of said bids, without the consent of the Deputy Procurement Officer. The City of Fond du Lac may reject any or all bids on any basis and without disclosure of any reason. The failure to make a disclosure shall not result in accrual of any right, claim or cause of action against the City. The City also reserves the right to waive any formalities or informalities in bidding, and to select the bid that, in its opinion, will best serve the interests of the City. No bid will be opened unless the Bidder's Proof of Responsibility for 2022 is filed and approved at least (5) five days before the scheduled time for opening of bids. Reference is made to Section 66.0901(2) & (3) Wisconsin Statutes. The Director of Public Works decision as to qualifications shall be final. Each proposal shall be accompanied by a certified check, or bank draft, payable to the City of Fond du Lac, or satisfactory bid bond, in the amount of 5% of the gross bid as a guarantee that if the bid is accepted as the successful bid, such successful bidder will execute and file the proposed contract and performance bond within ten (10) days after notice of award of contract.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents