Similar Projects
HSE Septic Project 2
Infrastructure
Post-Bid
Ortonville, MI 48462

South Evergreen Interceptor Rehabilitation
Infrastructure
Post-Bid
Waterford, MI

North Interceptor East-Arm PCI-4 Rehabilitation Contract No-1
Results
Waterford, MI 48328

Big Beaver Relief Sewer
Results
Less than $4,000,000 est. value
Troy, MI

Pontiac Area 3 Sewer System Upgrade
Infrastructure
Post-Bid
$2,400,000 est. value
Waterford, MI

Asphalt Resurfacing and Catch Basin Repair at Camp Dearborn and Mystic Creek Golf
Results
Milford, MI 48380

SAW Additional Televising Areas
Infrastructure
Post-Bid
Bloomfield Township, MI

2020 Cipp Program
Results
Troy, MI

Harvey-Swanson Elementary School Septic Field Replacement
Results
Ortonville, MI

Farmington Booster Pipe Rehabilitation
Results
Farmington Hills, MI 48332

Grates and Frames, Annual Estimated Quantities
Term Contract
Results
MI

Manhole Structure Supplies, Annual Estimated Quantities
Term Contract
Results
MI

CWWTP 36 Sanitary Sewer Rehabilitation
Infrastructure
Results
Less than $290,000 est. value
Commerce Township, MI

2021 Sewer Rehabilitation Program
Infrastructure
Results
$626,588 est. value
Bloomfield Hills, MI

Sewer Cleaning and Televising
Infrastructure
Results
Troy, MI

Reported 06/02/2022 12:00 AM
Project Title

Sanitary Disposal System Rehabilitation

Physical Address View project details and contacts
City, State (County) Royal Oak, MI   (Oakland County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The approximate quantities for the major items of work for this project are as follows: 1.Cured-In-Place Pipe Lining 3,175 Lft 2.Spot Liner 58 Lft 3.Point Repair 1 Ea and all the miscellaneous items of removal, construction and restoration set forth in the Proposal. 4.Materials for this project must meet the AIS requirements of the Clean Water State Revolving Fund.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Operation and Maintenance of Utilities, Operation and Maintenance of Sewer Utilities, Rehabilitation of Sewer Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents