Similar Projects
Last Updated | 11/16/2022 11:33 PM |
Project Title | SCCWWA Phase 1A - Lift Stations (LS), Force Mains (FM), & Zweibel Creek - 3 Interceptor (ZC-3) |
Physical Address | View project details and contacts |
City, State (County) | Springfield, NE 68059 (Sarpy County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Material only procurement package for 165,000+ LF of 4710 HDPE force main piping consisting primarily of 14" & 20" pipe. There is a smaller share of 16", 24", 30", 36", & 48" pipe on the project. HDD trenchless installation requires SDR 11 pipe, while all other applications require SDR 21. Pipe lengths should be delivered in 50 ft lengths. This proposal package will procure HDPE pipe of all sizes for all work segments (listed below), and will include HDPE bends, fittings, electrofusion couplings, and other required material accessories. Monthly rental pricing for HDPE fusion machines (machine only, no operator labor) should be provided as an alternate for consideration. Costs should be provided as dollar per linear foot ($/LF) were applicable. Hawkins Construction is the Construction Manager at Risk (CMaR) for this project. The proposed project area is generally located between the City of Springfield’s Wastewater Treatment Facility (SWWTF) at 17305 S Hwy 50 and extends east to the City of Omaha’s Papillion Creek Waste Resource Recovery Facility (PCWRRF) located at 15705 Harlan Lewis Road in Bellevue, Nebraska. The project is commonly referred to as Phase 1A of the system. Phase 1A will include three (3) lift stations, approximately 16 miles each of 20" & 14" HDPE force main interceptor and approximately 1.5 miles of gravity main interceptor. Teaming Approach: As Construction Manager, Hawkins Construction prequalified "Team Members" who will be allowed to propose and perform the force main and gravity sewer pipe work. These team members are Hawkins Construction of Omaha, NE, Heimes Corp of Omaha, NE, and Van Kirk Brothers Contracting of Sutton, NE. The work will consist of 7 separate bid packages as follows: Pipe Procurement (Material Only) Lift Stations (3 separate locations) - HCC acting as CM/GC Zweibel Creek Gravity Interceptor Force Main Segment 1 Force Main Segment 2 Force Main Segment 3 Force Main Segment 4 The project duration can generally be described as 24 months beginning in August 2022. This project has the following State & Federal Requirements MBE/WBE/DBE Subcontractor Participation Fair Share per 40 CFR 35.6580. - 14% (6% MBE & 8% WBE) E-Verify Federal Immigration Verification Davis Bacon Prevailing Wage & Certified Payroll American Iron and Steel (AIS) Products per FWPCA Section 608 A full listing of the State and Federal Regulations can be found at and is based upon the EPA’s listing of “Additional Information on Cross-Cutting Federal Authorities” (http://water.epa.gov/grants_funding/dwsrf/xcuts.cfm) and the EPA’s “Cross-Cutting Federal Authorities: A Handbook on Their Application in the Clean Water and Drinking Water State Revolving Fund Programs” (October 2013: http://www2.epa.gov/sites/production/files/2015-08/documents/crosscutterhandbook.pdf) as of October 12, 2015. This list is subject to change based upon the federal authorities of the EPA. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |