Similar Projects
New Jail Development - Sarpy County
New Construction, Infrastructure - 146,000 SF
Design
$68,500,000 CJ est. value
Papillion, NE 68046

The Bridge Flats
New Construction, Infrastructure - 18,000 SF
Design
$13,000,000 CJ est. value
Bellevue, NE 68005

SATCOM - MILSTAR Building OFFUT AFB
New Construction, Infrastructure
Bidding
$40,000,000 CJ est. value
Bellevue, NE 68123

SATCOM - MILSTAR Building OFFUT AFB
New Construction, Infrastructure
Bidding
$40,000,000 CJ est. value
Bellevue, NE 68123

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

Southern Sarpy County Regional Wastewater System - Phase 1A - LS & FM
New Construction, Infrastructure
Post-Bid
$40,000,000 CJ est. value
Springfield, NE 68059

Aspen Creek North - Phase 2 Water Main Improvements
Infrastructure
Results
Gretna, NE

US-6/Harrison ST
Infrastructure
Results
$5,000,000 est. value
NE

Stadium Team Meeting Room Building - Papillion LaVista Public Schools
New Construction, Infrastructure - 4,950 SF
Construction
$940,500 CJ est. value
Papillion, NE 68046

Nebraska Crossing
Addition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Gretna, NE 68028

Crisis Stabilization Center - Sarpy County
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Bellevue, NE 68005

RFP - Sewer Rate Study
Term Contract
Bidding
La Vista, NE 68128

Nebraska Army National Guard Bellevue Readiness Center (Milcon)
New Construction, Infrastructure - 95,000 SF
Post-Bid
$33,000,000 CJ est. value
Bellevue, NE 68123

Building V Water Main Relocation Nebraska Crossing Outlets
Infrastructure
Results
Gretna, NE

R&R Commerce Park South Additional Phases / Sarpy Industrial / Papillion
New Construction, Infrastructure - 862,000 SF
Pending Verification
$449,000,000 CJ est. value
Richland Viii, NE 68138

Last Updated 11/16/2022 11:33 PM
Project Title

SCCWWA Phase 1A - Lift Stations (LS), Force Mains (FM), & Zweibel Creek - 3 Interceptor (ZC-3)

Physical Address View project details and contacts
City, State (County) Springfield, NE 68059   (Sarpy County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Material only procurement package for 165,000+ LF of 4710 HDPE force main piping consisting primarily of 14" & 20" pipe. There is a smaller share of 16", 24", 30", 36", & 48" pipe on the project. HDD trenchless installation requires SDR 11 pipe, while all other applications require SDR 21. Pipe lengths should be delivered in 50 ft lengths. This proposal package will procure HDPE pipe of all sizes for all work segments (listed below), and will include HDPE bends, fittings, electrofusion couplings, and other required material accessories. Monthly rental pricing for HDPE fusion machines (machine only, no operator labor) should be provided as an alternate for consideration. Costs should be provided as dollar per linear foot ($/LF) were applicable. Hawkins Construction is the Construction Manager at Risk (CMaR) for this project. The proposed project area is generally located between the City of Springfield’s Wastewater Treatment Facility (SWWTF) at 17305 S Hwy 50 and extends east to the City of Omaha’s Papillion Creek Waste Resource Recovery Facility (PCWRRF) located at 15705 Harlan Lewis Road in Bellevue, Nebraska. The project is commonly referred to as Phase 1A of the system. Phase 1A will include three (3) lift stations, approximately 16 miles each of 20" & 14" HDPE force main interceptor and approximately 1.5 miles of gravity main interceptor. Teaming Approach: As Construction Manager, Hawkins Construction prequalified "Team Members" who will be allowed to propose and perform the force main and gravity sewer pipe work. These team members are Hawkins Construction of Omaha, NE, Heimes Corp of Omaha, NE, and Van Kirk Brothers Contracting of Sutton, NE. The work will consist of 7 separate bid packages as follows: Pipe Procurement (Material Only) Lift Stations (3 separate locations) - HCC acting as CM/GC Zweibel Creek Gravity Interceptor Force Main Segment 1 Force Main Segment 2 Force Main Segment 3 Force Main Segment 4 The project duration can generally be described as 24 months beginning in August 2022. This project has the following State & Federal Requirements MBE/WBE/DBE Subcontractor Participation Fair Share per 40 CFR 35.6580. - 14% (6% MBE & 8% WBE) E-Verify Federal Immigration Verification Davis Bacon Prevailing Wage & Certified Payroll American Iron and Steel (AIS) Products per FWPCA Section 608 A full listing of the State and Federal Regulations can be found at and is based upon the EPA’s listing of “Additional Information on Cross-Cutting Federal Authorities” (http://water.epa.gov/grants_funding/dwsrf/xcuts.cfm) and the EPA’s “Cross-Cutting Federal Authorities: A Handbook on Their Application in the Clean Water and Drinking Water State Revolving Fund Programs” (October 2013: http://www2.epa.gov/sites/production/files/2015-08/documents/crosscutterhandbook.pdf) as of October 12, 2015. This list is subject to change based upon the federal authorities of the EPA.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents