Similar Projects
Hoffman Car Wash
New Construction - 6,400 SF
Construction
$5,000,000 est. value
Yorkville, NY 13495

Valet Car Wash
Renovation
Pending Verification
Syracuse, NY 13208

Hoffman Car Wash
New Construction - 5,600 SF
Construction
$2,300,000 est. value
New Hartford, NY 13413

Car Wash Bay
New Construction
Design
South Salem, NY 10590

Hoffman Car Wash
New Construction - 6,400 SF
Conception
$4,000,000 est. value
Moreau, NY

Troy Division and Schenectady Division Bus Wash Replacements
Post-Bid
Schenectady, Troy, NY 12308

Troy Division and Schenectady Division Bus Wash Replacements
Post-Bid
Schenectady, Troy, NY 12308

Hoffman Car Wash
New Construction - 5,600 SF
Design
$5,000,000 est. value
Cohoes, NY 12047

Scrub a Dub Car Wash
New Construction - 3,300 SF
Design
$500,000 to $1,000,000 CJ est. value
Kingston, NY 12401

Splash Car Wash
Renovation
Design
White Plains, NY 10607

Blue Buffalo Car Wash
New Construction - 6,500 SF
Construction
$2,500,000 est. value
West Seneca, NY 14224

Bestway Warehouse
Addition - 2,500 SF
Construction
Cortland, NY 13045

Magic Mist Auto Wash
New Construction - 3,400 SF
Construction
Grand Island, NY 14072

Hoffman Car Wash
New Construction - 6,400 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Rome, NY 13440

Last Updated 07/23/2021 09:09 AM
Project Title

Bus Wash Repairs

Physical Address View project details and contacts
City, State (County) Averill Park, NY   (Rensselaer County)
Category(s) Commercial
Sub-Category(s) Car Wash
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000 to $60,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Inspect frame, curb rail system, undercarriage spray bar and associated hardware. 2. Replace blue hoses that feed spray arches & undercarriage spray bar with new SS clamps. 3. Clean/ replace all undercarriage, pre-soak and rinse spray nozzles as needed. 4. Replace four (4) pre-soak & rinse arch drain ball valves. 5. Stabilize existing framework with six (6) knee braces. 6. Replace air regulator trio & MAC valve in new NEMA box. 24V. 7. Replace both air retract cylinders and associated hardware. 8. Install new drivers side and passengers side Superflex couplers and Bushings with new stabilizer brackets and associated hardware. 9. Replace one missing disc brush protector with hardware. Inspect other disc & hardware. 10. Inspect brush arms, motors, gearboxes and associated hardware, lubricate as needed. 11. Replace broken Allen Bradley rotating manual disconnect switch on reclaim electrical control box. Replace both drivers and passenger’s side brush limit chain assemblies with hardware. 12. Repair roof scrubber curtain racks with 3 new rods & new curtain strips. Replace heavily rusted top wash spray bar pipe. 13. Install new chemical injector. 14. Adjust both brush assembly pillow blocks and all system timers. 15. Install District provided new shocks (4) & fiberglass wands that were ordered last year. 16. Install lOHP Grundfos vertical rinse pump unit, fresh water holding tank and associated plumbing. District to provide proper electric service to pump motor per WCB direction. 17. Install PVC union and pipe support at link pipe on the two existing reclaim water tanks

Details

Car Wash, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents