Similar Projects
Flooring NF 323182 Exit Yellow (ERV
Post-Bid
Philadelphia, PA

Flooring Safety Applique Incom Css10268
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

Commonwealth Court of Pennsylvania - Flooring and Carpet Replacement
Results
Harrisburg, PA 17120

Apparatus Bay Floor Resurfacing at Fire Station No. 340
Results
Altoona, PA 16602

Carpeting Replacement at NHSD Middle School
Post-Bid
Pittsburgh, PA 15229

Floor Tiles 2019
Results

DLCC Ballroom Carpet Installation
Post-Bid
Pittsburgh, PA

Recreation Center Lower Corridor and Concourse Floor Project
Results
Slippery Rock, PA 16057

Carpeting
Post-Bid
Philadelphia, PA

New Cumberland Public Library Floor Replacement
Results
$25,000 est. value
New Cumberland, PA 17070

Carpeting Tile for Domestic Relations
Post-Bid
Greensburg, PA 15601

Kitchen Flooring and Food Service Equipment
Results
Lebanon, PA 17042

Flooring Septa Spec S-1097-3 Rca Smooth
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

Convocation Floor Refinishing
Results
$50,000 to $150,000 est. value
California, PA 15419

Bid for Carpeting for C and Y
Post-Bid
Stroudsburg, PA

Last Updated 04/08/2020 01:24 PM
Project Title

Lower Gwynedd Elementary School Quartz-LVT-VCT and Terrazzo Flooring Installation

Physical Address View project details and contacts
City, State (County) Ambler, PA 19002   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposal shall include all cost to remove and dispose of existing Fritz & VCT tile and base, remove and dispose of existing rubber stair treads, risers and landings. Patch, at a depth of 1/8”, the entire areas receiving new tile or sheet flooring. 1. Remove existing Fritz tile and cove base, furnish and install new UPOFLOOR Mosaic Collection Quartz tile and new Roppe rubber 4.5” cove base in corridors highlighted in Green on floor plans pages 34 & 35. Current corridor tile has a 12” (3) three color pattern to be duplicated with new 24” x 24” tile. 2. Remove existing vinyl tile and cove base and furnish and install new Shaw Contract, Basstones Commercial Heterogeneous Sheet flooring and new Roppe 4.5” rubber cove base in classrooms 108, 109, 110, 111, 116, 117, 118, 119, 124, 125, 126, 127, 208, 209, 210, 211, 216, 217, 218, 219, 224, 225, 226 & 227, highlighted in Red on floor plans pages 34 & 35. Installation will include cutting classroom carpet back 3” and installing rubber transition piece at new sheet flooring edge. 3. Remove existing VCT tile and cove base and furnish and install new Shaw Contract JOY SQUARED LVT 24” x 24” tile and new Roppe 4.5” rubber cove base in room Art Room 114 highlighted in Purple on the floor plan page 34. (3) Three color pattern to be installed. 4. Remove existing rubber stair treads, risers and landings and replace new Roppe rubber stair treads, risers and landings in main and rear stairwells highlighted in Blue on the floor plan pages 34 & 35. 5. Remove existing Fritz tile and cove base, grind subfloor to manufactures specifications, prepare floor with moisture treatment. Install 2 color Terrazzo flooring matching existing pattern with 5” Terrazzo base and a (3) letter school insignia in the Main Lobby highlighted in Yellow on the floor plan page 34. 6. Alternate #1: Remove existing VCT tile and cove base and furnish and install new Armstrong VCT tile and new Roppe 4.5” rubber cove base in main office, nurse’s office and custodial closets highlighted in Brown on the floor plan page 34 & 35.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents