Similar Projects
Force Main Replacement
Bidding
Collegedale, Ooltewah, TN 37363

Raise & Lower Manholes for TN State Paving Projects for WRD
Term Contract
Bidding
Chattanooga, TN

Sanitary Sewer Mainline Full Wrap Service Connection
Post-Bid
Chattanooga, TN

Lupton City Mill Sewer Relocation
Post-Bid
Chattanooga, TN 37405

Former Harriet Tubman Homes Site Sewer Relocation
Results
Chattanooga, TN 37406

WWTA Contract to Raise Existing Manhole Frames
Results
Chattanooga, TN 37402

Utility Service for East Ridge Splash Pad
Bidding
East Ridge, TN

Sewer Line Cleaning Services
Post-Bid
Chattanooga, TN 37402

Dobbs Branch Basin Improvements Phase 2
Results
Less than $9,598,525 est. value
Chattanooga, TN 37405

Hixson Marina Cove Slip Lining
Bidding
Hixson, TN 37343

East Ridge Basin 1-75 Collector Sewer Project
Post-Bid
Chattanooga, TN 37402

Dobbs Branch Basin Improvements Phase 1
Results
Chattanooga, TN 37402

East Ridge Sewer Basin 3C and 4B Rehabilitation
Post-Bid
Chattanooga, TN

Amos Road Force Main Replacement
Results
Less than $834,825 est. value
Chattanooga, TN 37400

Lupton Drive Chronic SSO Elimination
Renovation
Post-Bid
Chattanooga, TN 37400

Last Updated 12/19/2019 09:35 AM
Project Title

Focused SSES and Rehabilitation - South Chickamauga Creek 1 - Phase 2

Physical Address View project details and contacts
City, State (County) Chattanooga, TN 37405   (Hamilton County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of rehabilitation/replacement of sanitary sewer piping and manholes, including: Approximately 5,540 feet of cured in place pipe sewer rehabilitation, of which approximately 1,380 feet is 18-inch diameter, 2,010 feet is 15-inch diameter, and 2,150 feet is 12-inch diameter. Open cut replacement of approximately 230 feet of 18-inch diameter sewer Replacement of 2 precast sanitary sewer manholes Full depth rehabilitation of 23 manholes utilizing polymer resin-based lining; Installation of 25 new watertight manhole frames and covers

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents