Similar Projects
Operating Rooms & Support Spaces
Renovation - 20,000 SF
Conception
$9,700,000 to $10,000,000 est. value
Buffalo, NY 14215

Clinical Research Center and Center for Early Phase Clinical Trials Relocation
Renovation
Conception
Buffalo, NY 14203

Our Lady of Victory - Loading Dock Improvements
Renovation - 1,500 SF
Bidding by Invitation
Buffalo, NY 14218

Building Facade Services
Renovation
Post-Bid
Buffalo, NY 14263

Fluoroscopy Equipment Replacement Kenmore Mercy Hospital
Renovation - 1,000 SF
Post-Bid
$200,000 est. value
Kenmore, NY 14217

USAF Engineering Infrastructure Repair (EIR) MATOC
Results
$100,000 to $250,000,000 est. value

ECMC 9 Zone 2 Safe Room Renovations
Renovation
Construction
$318,400 est. value
Buffalo, NY 14203

Roswell Park IMCU / BMT
Renovation - 19,450 SF
Construction
$5,300,000 est. value
Buffalo, NY 14263

Mercy Hospital Emergency Department
Renovation
Pending Verification
$350,054 est. value
Buffalo, NY 14220

Sisters Of Charity Hospital St. Joseph Campus – Fire Protection Infrastructure
Renovation
Post-Bid
$750,000 est. value
Cheektowaga, NY 14225

CHIP Infusion Pharmacy
Renovation
Construction
Depew, NY 14043

CHS Thrive 2 At Caritas Medical Arts Building
Renovation - 2,257 SF
Post-Bid
Cheektowaga, NY 14225

Sisters of Charity Fluoroscopic Room
Renovation
Construction
Buffalo, NY 14214

Cardiology Clinic at Sisters of Charity Hospital
Renovation
Construction
Buffalo, NY 14214

John R Oishei Children's Hospital Operating Room
Renovation
Construction
$380,034 est. value
Buffalo, NY 14203

Last Updated 01/04/2021 03:11 PM
Project Title

MEP & Elevator Improvements

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14215   (Erie County)
Category(s) Medical
Sub-Category(s) Hospital
Contracting Method Qualified Bidding.
Project Status Project Delayed, Seeking Funding, Construction Start Expected third quarter 2021
Bids Due View project details and contacts
Estimated Value $45,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Major improvements to the main hospital & boiler chiller plants mechanical, electrical, plumbing and HVAC systems. Extensive utility shutdowns, temporary system cross overs and phased sequences of construction are anticipated for this project including weekends & 3rd shift work. The Projects scope will include the replacement of emergency generators, air handler units, air conditioning units, VAVs & adjustable speed drives. Several temporary air handler units & roof steel support frames will be used to keep the building systems operational. Extensive electrical system replacements will include electrical substations, transfer switches, motor control centers, interior lighting improvements, Fire alarm improvements and direct digital control work. The project will also include: elevator replacements at the lab building and selective repairs to the public elevators and DK Millers elevator. Work will also include fire protection / sprinkler installations, as well as underground fuel tank removals and replacements.

Details

Hospital, 1 Story Above Grade, 15,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents