Similar Projects
Saint Martins Booster Station Upgrade (North Pinedale Booster) - 50449 - City Of Rapid City
Renovation
Conception
$3,050,000 CJ est. value
Rapid City, SD 57701

Elk Vale Lift Station - 50729 - City of Rapid City
New Construction, Infrastructure
Conception
$5,061,808 CJ est. value
Rapid City, SD 57701

Mainline Pumps for Crooks Meter Building Project
Infrastructure
Bidding
$600,000 CJ est. value
Crooks, SD 57020

Well 8 Pump Recovery and Replacement Phase 1: Pump and Motor Recovery
Infrastructure
Bidding
$200,000 CJ est. value
Rapid City, SD 57701

East Farmer Avenue Lift Station Replacement
New Construction
Post-Bid
$300,000 est. value
Howard, SD 57349

Industrial Park Development & Industrial Park Lift Station
New Construction, Infrastructure
Post-Bid
Wall, SD

Pump Station 203 Improvements
Results
$2,150,000 est. value
Sioux Falls, SD

Creek Lift Station and Force Main
New Construction
Results
SD

Shepherd Hills Water Booster Pump Station - 51338 - City of Rapid City
New Construction, Infrastructure
Conception
$550,000 CJ est. value
Rapid City, SD 57701

Intake Improvements Lower Brule Rural Water System
Renovation, Infrastructure
Post-Bid
$1,129,730 CJ est. value
Lower Brule, SD 57548

Pump Station 240 Capacity Improvements
Results
Less than $5,687,511 est. value
Sioux Falls, SD 57110

Water Booster Station Electrical Improvements - 51270 - City of Rapid City
Renovation
Conception
$800,000 CJ est. value
Rapid City, SD 57701

Meter Buildings
Renovation
Results
$1,800,000 to $2,250,000 est. value
Hull, Sioux Center, IA - Beresford, SD

Well #10 Pump Replacement and Electrical Improvements - 51362 - City of Rapid City
Infrastructure
Conception
$418,000 CJ est. value
Rapid City, SD 57701

Sturgis I-90 Crossing and Booster Station
New Construction
Results
$2,162,126 to $2,883,016 est. value
Sturgis, SD

Last Updated 10/27/2022 09:26 AM
Project Title

Holgate Middle School Pump House Renovation

Physical Address View project details and contacts
City, State (County) Aberdeen, SD 57401   (Brown County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

Bids will be awarded at a regular meeting of the Aberdeen Park and Recreation Board in the Aberdeen Parks, Recreation and Forestry Department Office, 225 Third Avenue Southeast, Aberdeen, South Dakota, at 12:00 noon on Wednesday, October 5th, 2022. Bids shall be submitted in accordance with the specifications. All bids shall be plainly marked on the outside of the envelope with the words "Bid for Holgate Restrooms." Each bid in excess of $25,000 shall be accompanied by a ten percent (10%) Bid Bond or a certified check or a cashiers check in an amount equal to at least five percent (5%) of the total gross bid, the same to be issued by a solvent bank authorized to operate in South Dakota, and made payable to the City of Aberdeen, South Dakota. These securities are to be guarantees that if the Proposal is accepted, a contract will be entered into by the Bidder. Contracts in excess of $25,000 will require a Payment Bond and a Performance Bond acceptable to the City of Aberdeen, South Dakota, for one hundred percent (100%) of the Contract, in conformance with the requirements of the Contract documents. No bid may be withdrawn within a period of thirty (30) days after the date fixed for opening bids. The Park and Recreation Board reserves the right to reject any and all bids and make the award on the basis of the lowest and best qualified bidder. All parts of the work shall be braced to resist wind or other loads. The contractor shall perform the work with the explicit understanding that the design of the project is based on all parts of the work having been completed and as such, the methods of performance of each part of the work shall be done accordingly. Temporary items such as, but not limited to: Scaffolding, staging, lifting, and hoisting devices, shoring, excavation barricades, and safety and construction procedures necessary in completion of the project shall be the responsibility of the contractors and their subcontractors and shall comply with the applicable codes and regulations. OSHA Standards for the Construction Industry (29CFR Part 1926) shall be complied with in every respect. It shall not be the responsibility of the owner or the architect to determine if the contractors, subcontractors, their representatives are in compliance with the aforementioned regulations. SCOPE OF WORK: The prime contractor shall furnish all labor, materials, equipment, and service and perform all the work of each respective contract as shown on the drawings and specified in the specifications prepared by HKG Architects, Inc., AIA, Aberdeen, South Dakota and their consulting engineers. Contractors shall, prior to start of work, set the work schedule and sequence with the owner and secure approval of same. Suitable access to and from existing building and all other areas must be provided at all times. Prime contractors shall cooperate with each other to insure a smooth-running, well-organized project.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents