Similar Projects
Building 0009 Repair Deep Water Intake Pipe
Alteration
Design
$500,000 to $1,000,000 est. value
Rock Island, IL

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Vortisand Water Filtration System Update
Results
Rock Island, IL 61299

2021 Seal Coat Program
Infrastructure
Results
Moline, IL

Third Street New Commercial Development
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
East Moline, IL 61244

Installation of Oversized Chevrons along Interchange Ramp Curves at Various Locations
Infrastructure
Post-Bid

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Washing Five Bridges Over the Rock River, in Henry and Rock Island Counties
Infrastructure
Post-Bid

HMA Resurfacing
Infrastructure
Results
$111,593 est. value
Hampton, IL

Washing the Bridge (SN 081-0011) Carrying I-80 Over the Mississippi River
Infrastructure
Post-Bid
IL

Deck Repair, Siding, & Handrails
Infrastructure, Alteration
Results
Rock Island, IL 61201

Washing Three Bridges Over the Mississippi River, Carroll County (SN008-0052) Carrying US 52/IL 64
Infrastructure
Post-Bid

HMA Overlay and Miscellaneous Work
Infrastructure
Results
Andalusia, IL

Washing Six Bridges Over the Rock River, in Henry, Rock Island and Whiteside Counties
Infrastructure
Post-Bid

Last Updated 01/26/2023 11:03 AM
Project Title

2023 Patching Program

Physical Address View project details and contacts
City, State (County) Moline, IL 61265   (Rock Island County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,607,675 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project work includes pavement patching at various locations throughout Moline. Work also includes utility adjustments, driveway and sidewalk work, etc.Pavement patching, including pavement removal, pavement replacement, all necessary excavation and replacement with the Class and Type of patch specified. Sidewalk, driveway, utility adjustments and other incidental work included. to the Bidding Instructions for additional information. As per 820 ILCS 130/1, prevailing wages shall be required for this project. Project questions shall be directed to Erin Bruner at (309) 524-2367 or ebruner@moline.il.us.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents