Similar Projects
Smithville Road Culvert Replacement - BR-2017-009H - County of Peoria
Infrastructure
Conception
$300,000 CJ est. value
Mapleton, IL 61547

Voorhees Road Bridge Replacement - BR-2018-009H - County of Peoria
Demolition, New Construction, Infrastructure
Conception
$300,000 CJ est. value
Edwards, IL 61528

New Restroom and Site Work W. H. Sommer Park
New Construction, Infrastructure
Design
$251,000 CJ est. value
Edwards, IL 61528

Maxwell Road Bridge - BR-2017-014H - County of Peoria
Infrastructure, Renovation
Design
$2,943,132 CJ est. value
Peoria, IL 61607

Peoria County Juvenile Detention Center Parking Lot Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Peoria, IL 61603

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Street Maintenance-Sealcoating and Fog Coating
Infrastructure
Post-Bid
Elmwood, IL

Partial Roadway Replacement - Peoria Stadium
Infrastructure
Results
Peoria, IL 61614

General Wayne A. Downing Peoria International Airport
Renovation, Infrastructure
Results
Peoria, IL

Lower Veteran's Park - Pickleball Courts
Infrastructure
Construction
$418,570 CJ est. value
Peoria, IL 61602

Lower Veteran's Park - Pickleball Courts
Infrastructure
Construction
$418,570 CJ est. value
Peoria, IL 61602

County Road 201 Remodel and Technology Upgrade - CH-19-003 - County of Peoria
Infrastructure
Conception
$350,000 CJ est. value
Peoria, IL 61603

Sealcoating
Infrastructure
Post-Bid
IL

Spring Lane and Orchard Lane Project
Infrastructure
Results
Peoria, IL 61615

Mapleton Road - HW-2017-003H - County of Peoria
Infrastructure
Conception
$320,000 CJ est. value
Hollis Township, IL 61547

Last Updated 04/29/2023 05:04 PM
Project Title

Shoulder Reconstruction and Slope Stabilization Along Us 24

Physical Address View project details and contacts
City, State (County) Bartonville, IL 61607   (Peoria County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $323,800 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the east shoulder and foreslope repair which will include the removal and replacement of hot-mix asphalt shoulders, the removal and replacement of unsuitable material, installation of pipe underdrains, the removal and replacement of stone riprap, guardrail replacement, and other related collateral work necessary to complete the project. Shoulder reconstruction and slope stabilization along US 24, 0.7 mile North of IL 9 in Peoria County. Region 3 District 4 Federal Project # N/A County(s) Peoria Key Route(s) FAP 317 Marked Route(s) US 24 Section(s) (46)SR,SLP State Job #(s) C-94-023-20 PPS #(s) 0-02177-4017 20 Working Days Questions not accepted as of April 18, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 104 - Shoulder Reconstruction and Slope Stabilization Along Us 24

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents