Similar Projects
Railroad Crossing Improvements
Post-Bid
Richmond, TX 77469

Inspection, Maintenance and Repair of Railroad Spurs
Term Contract
Post-Bid
Dallas, TX 75203

Rail Replacement - Northbound Track Outer Rail Braeswood Boulevard at Fannin Street
Results
Less than $1,119,907 est. value
Houston, TX 77000

Inspection, Preventative Maintenance and Repair of Railroad
Term Contract
Results
Dallas, TX 75212

Rail Construction Services
Post-Bid
Paris, TX 75460

Informal - Railroad Repair Work BCT
Results
Less than $20,650 est. value
Houston, TX 77252

BNSF - New Inspection Pit
New Construction
Post-Bid
Temple, TX

Railroad Repairs On A as Needed Basis for the Port of Houston Authority
Results
Houston, TX 77252

Inspection, Maintenance and Repairs of Rail System Fy21
Term Contract
Post-Bid
TX 75212

Track Maintenance
Results
Less than $3,664,332 est. value
Houston, TX 77002

Upgrade Bridge Rail and MBGF
Results
Less than $2,891,115 est. value
TX

Railroad Track Inspection and Switch Maintenance
Results
$15,000 to $65,000 est. value
TX

Remove/Replace Bridge Rail
Results
Less than $296,919 est. value
TX

Remove/Replace Bridge Rail
Results
Less than $1,555,249 est. value
TX

SH 31 Industrial Park Rail Spur
Results
Corsicana, TX 75110

Last Updated 08/05/2020 03:42 PM
Project Title

Rail Restoration and Replacement Services

Physical Address View project details and contacts
City, State (County) Paris, TX 75460   (Lamar County)
Category(s) Transportation
Sub-Category(s) Railroad/Subway
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Installation and replacement of 470 crossties. 2. Tightening of all track bolts in all joints, and replacement of any missing or broken bolts. 3. Distribution of 200 tons of D-ballast for surfacing of approximately 1654 feet of rail, as needed; 4. Mechanical tamping and regulation of approximately 1654 track feet of rail (regulated to G&W standards). a) Raise of 1.5 inches – track will be tamped behind tie installation with double insertions with a mechanical tamper. b) Rock will be dumped as needed to fill in, making a minimum of one more tamping pass of double insertions and dressed to G&W standards. 5. Gage will not exceed 56 5/8 inches. 6. Awarded contractor will be responsible for scrap tie disposal from the property, upon 15 days from completion of project work.

Details

Division 34 - Transportation, Rail Tracks, Ballasted Track Rail.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents