Similar Projects
16 Potable Pipe Crossing of Fountain Creek
Post-Bid
Pueblo, CO

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Annual Contract for Water Meters - 1 /2" and 2"
Term Contract
Results
Pueblo, CO 81002

Annual Contract for Water Meters - 3/4" and 1"
Term Contract
Results
Pueblo, CO 81002

Annual Contract for Compound Water Meters
Term Contract
Results
$30,000 to $35,000 est. value
Pueblo, CO 81002

2020 Northside Service Line Potholing
Results
Pueblo, CO 81002

Annual Contract for Turbine Water Meters
Term Contract
Results
Less than $57,556 est. value
Pueblo, CO 81003

Resilient Seated Gate Valves 2020
Term Contract
Results
Pueblo, CO 81002

Tapping Sleeves 2020
Term Contract
Results
Pueblo, CO 81002

Fire Hydrants 2020
Term Contract
Results
Pueblo, CO 81002

Cast Iron Fittings 2020
Term Contract
Results
Pueblo, CO 81002

Repair Couplings 2020
Term Contract
Results
Pueblo, CO 81002

Water Supply of 16" DR 18 PVC Pipe 2020
Results
Pueblo, CO 81002

Six-Month Contract for PVC Water Distribution Pipe
Term Contract
Results
Pueblo, CO 81002

Last Updated 12/22/2021 02:39 AM
Project Title

2021 Platteville Boulevard Water Main Replacement

Physical Address View project details and contacts
City, State (County) Pueblo West, CO 81007   (Pueblo County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of this project will consist of but not limited to the construction of replacement C900 PVC potable waterline valve, tie-ins, and appurtenances between Limon Dr. and Winona Dr. along Platteville Blvd., installed by open trench method. The project will tie in to the existing 10-inch by 8-inch diameter tee located at the junction of Platteville Blvd. and Limon Dr. and extend approximately 1,614 feet to existing 8-inch by 6-inch tee at the junction of Platteville Blvd. and Winona Dr.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents