Reported | 05/20/2020 12:00 AM |
Project Title | Lake Rim Elementary, Canopy Replacement |
Physical Address | View project details and contacts |
City, State (County) | Fayetteville, NC 28314 (Cumberland County) |
Category(s) | Single Trades |
Sub-Category(s) | Finishes/Exterior |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFP) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Canopies tops materials specified: 1) Structural members at canopies sides will be 6 inch x 4 inch x 3 inch eave struts sloped up, manufactured in 14 gauge steel, primed coated ready to accept finish paint by others. 6 inch eave strut attachment to existing steel frame to be designed by engineer of record. 2) Structural members at canopies ridge will be 8 inch x 5 inch x 3 inch eave struts sloped down, manufactured in 14 gauge steel, primed coated ready to accept finish paint by others. 8 inch eave strut attachment to existing steel frame to be designed by engineer of record. 3) Roof panels will be .040 x 3 inch x 12 inch aluminum material snap-lock design at side laps. Roof panels will be boxed 90 degrees one (1) end to prevent water infiltration at ridge area. Roof panels will be attached to sub framing by means of #10 x 5/8 inch teks stainless steel screw fasteners. Roof panels will be factory painted white color. 4) Canopy ridge protector will be .040 x 8 inch x 1/2 inch hemmed aluminum material to fit roof slope both sides. Canopy ridge protector will be fastened to roof panels per engineer design. Roof ridge protector will be factory painted white color. 5) Contractor must verify all measurements both to existing canopies and materials to be used. a. Remove existing roof materials and metal on the bottom side of canopy b. Replace top with metal to have a 2” fall as to get water to existing gutters c. Keep area safe at all times d. Remove all old materials from project sire e. Check in at Main office each day before starting work |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |