Similar Projects
SH-109 - Bridge and Approaches
Infrastructure, Renovation
Conception
$3,432,524 CJ est. value
Hugo, OK 74743

Utilities - US 70
Infrastructure
Conception
$265,000 CJ est. value
Hugo, OK 74743

Grade, Drain, Bridge and Surface - US 34
Infrastructure
Design
$15,034,590 CJ est. value
Sayre, OK 73662

Grade, Drain, Bridge and Surface - US 34
Infrastructure
Design
$15,034,590 CJ est. value
Sayre, OK 73662

Disc Golf Course 2022
Infrastructure
Bidding
$85,000 CJ est. value
Yukon, OK 73099

Ross Terrace Road Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Mustang, OK 73064

Lake Region Electric Cooperative - Phase 1
New Construction, Infrastructure
Sub-Bidding
$4,000,000 CJ est. value
Hulbert, OK 74441

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Operation, Maintenance and Repair Services
Term Contract
Results
Oklahoma City, OK

Section II - 72-Inch Water Transmission Main Improvements
Infrastructure
Results
$5,467,875 est. value
Oklahoma City, OK

200 North Yukon Parkway
New Construction, Infrastructure
Pending Verification
Yukon, OK 73099

NW 10th @ The Stack
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Yukon, OK 73099

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Dahlonegah South Road
Infrastructure
Bidding
$150,000 CJ est. value
Stilwell, OK 74960

Last Updated 10/14/2022 08:33 AM
Project Title

Utilities - US 60

Physical Address View project details and contacts
City, State (County) Enid, OK 73701   (Garfield County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us-412: From Garland in Enid, Extend East 6.0 Miles to the Us-64 Junction (Ut for 04) As of October 14, 2022, the project is in Design status. Anticipated letting month/year is March, 2023. Length : 5.960 Mi OKDOT - Utilities - US 60 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents