Similar Projects
RFP - Downtown Mixed-Use Development
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Ozark, MO 65721

High Pointe Elementary Classroom Addition
Addition, Demolition, Infrastructure
Bidding
$5,238,600 CJ est. value
Nixa, MO 65714

RFQ Design - Architectural/Engineering Services Nixa Public Schools
Addition, Demolition, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Nixa, MO 65714

3rd and McCracken Road Intersection and Bridge Rehabilitation
Infrastructure
Post-Bid
$1,424,704 CJ est. value
Ozark, MO 65721

2022 Street and Sidewalk Improvement Projects
Infrastructure
Results
$300,000 est. value
Ozark, MO

Maintenance of Roads
Infrastructure
Results
Garrison, MO

Nixa Fire Protection District - New Fire Station #1
New Construction, Infrastructure - 9,430 SF
Construction
$2,965,562 CJ est. value
Nixa, MO 65714

O'Reilly Auto Parts (NX2) #6652 / Nixa
New Construction, Infrastructure - 7,228 SF
Construction
$400,000 CJ est. value
Nixa, MO 65714

Resurfacing Twins Road
Infrastructure
Post-Bid
$715,000 est. value
Sparta, MO 65753

Chip and Seal
Infrastructure
Results
Garrison, MO

Relocate Salt Dome
Demolition, New Construction, Infrastructure
Post-Bid
$70,000 CJ est. value
Nixa, MO 65714

Nelson Mill Bridge Deck Replacement
Demolition, New Construction, Infrastructure
Results
$490,000 CJ est. value
Union Chapel Township, MO 65714

RFQ Construction Managers at Risk (CMR) - Construction, Improvement, Repair, Remodeling, Renovation, and Equipping of District Facilities
Addition, Demolition, New Construction, Build-out, Renovation, Infrastructure
Post-Bid
$1,572,000 CJ est. value
Ozark, MO 65721

2023 Ozark Street Improvement Projects
Infrastructure
Results
$452,951 CJ est. value
Ozark, MO 65721

Greenhouse Kit
Renovation, Infrastructure
Post-Bid
$200,000 CJ est. value
Nixa, MO 65714

Last Updated 10/12/2023 09:47 AM
Project Title

Ina's Trail and Turnberry Stormwater Improvements

Physical Address View project details and contacts
City, State (County) Ozark, MO 65721   (Christian County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer - 09/07/23
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work includes furnishing all labor, equipment and materials, and performing all work necessary for the removal of 169 lineal feet of existing 30" storm sewer, removal of 2 existing stormwater culvert crossings, installation of 165 feet of new 30" HDPE storm sewer, installation of concrete junction box, installation of 84 lineal feet of new box culvert, construction of concrete block walls, new fencing, asphalt pavement repair, erosion control, finish grading and seeding, and any other incidental items and work described in the Project Manual, or reasonably inferable therefrom. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance with the Instructions to Bidders. The wage rates applicable to this project have been predetermined as required by law and are set forth in this specification. When Federal wage rates are applicable and included, this contract is subject to the "Work Hours Act of 1962," (P.L. 87-581: 76 Stat. 357) and implementing regulations. Effective January 1, 2009, and pursuant to RSMo 285.530 (1), No business entity or employer shall knowingly employ, hire for employment, or continue to employ an unauthorized alien to perform work within the state of Missouri. The successful bidder must submit a sworn affidavit and documentation affirming the business entity's enrollment and participation in the federal work authorization program and that all of its employees working for the contracted services are not illegal immigrants. Upon signing the contract, the successful contractor and any subcontractor performing the work shall provide a ten-hour Occupational Safety and Health Administration (OSHA) construction safety program for their on-site employees. The City of Ozark hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Question Deadline 09/26/2023 at 3:00 PM CT

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents