Similar Projects
Longmont Fire Station 2 and 6
Renovation
Design
Longmont, CO 80501

Construction of A Fire Station Support Facility (Gate 6), Fort Carson, Colorado (Pn 76447) (Fy21)
New Construction
Design
$5,000,000 to $10,000,000 est. value
Fort Carson, CO 80913

CCF North Fire Suppression Phase 2
Renovation
Bidding
$1,050,000 est. value
Canon City, CO

Weld County Training Site/Shooting Range
New Construction
Bidding
Carr, CO 80612

New Fire Barn No. 2
Post-Bid
Less than $3,000,000 est. value
Boulder, CO 80304

Fire Station #4 Renovation
Post-Bid
Poncha Springs, CO 81242

Downtown Fire Station Site
Results
Steamboat Springs, CO

Fort Lupton Fire Station 3 County Road 8 & Future Rollie Avenue
New Construction
Results
Less than $6,750,000 est. value
Fort Lupton, CO

Police Station 2nd Floor Renovation
Renovation
Construction
Black Hawk, CO 80422

New Fire Station
Construction
Falcon, CO 80831

Addition for existing four bay Station 5
Addition
Post-Bid
Less than $800,000 est. value
Ignacio, CO

Design for Fire Station in Crested Butte
Results
Crested Butte, CO

Design and Construction of Training Tower
Construction
Less than $1,500,000 est. value
Durango, CO 81301

Construct a Detached Fire Station Support Building at Turkey Creek Complex
New Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Colorado Springs, Fort Carson, CO 80913

Hartsel Ambulance Station Project
New Construction - 5,600 SF
Results
Less than $1,650,000 est. value
Hartsel, CO 80449

Last Updated 09/02/2021 10:36 AM
Project Title

Grand Junction Fire Department Fire Station #3 Construction

Physical Address View project details and contacts
City, State (County) Grand Junction, CO 81505   (Mesa County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method
Project Status Construction Commenced August 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction management and general contractor services to construct the new Fire Station #3 on 25 1/2 Road. This project includes the construction of a new Fire Station #3 at Pomona Park on 25 ½ Road. The proposed total building area will be approximately 10,500 square feet with a capability of housing 3 to 4 pieces of fire equipment including an engine and ambulance. The station will be staffed 24 hours a day (3 shifts of up to 8 fire personnel). The building will include office space, residential areas, storage, fitness, and drive-through bays for fire apparatus with full length floor trench drains. The new fire station building will sit adjacent to the existing station. 19 total parking spaces (including 2 ADA accessible parking spaces) are included in the design. Concrete sidewalks will run along the perimeter of the building for ease navigation of the building outdoor area. The south side of the building will feature a fenced courtyard. Existing mature trees shall be protected as shown on the landscape plans. The new irrigation system for the Fire Station will be connected to the Pomona Park irrigation system and have a back-up connection to the building domestic line.

Details

Fire/Police Station, New Construction, 1 Fire/Police Station, Approximately 10,500 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents