Similar Projects
Road Maintenance and Repair
Design
Blacksburg, Covington, Edinburg, Harrisonburg, Marion, Natural Bridge Station, Wise, VA

Road Maintenance and Repair
Design
Blacksburg, Covington, Edinburg, Harrisonburg, Marion, Natural Bridge Station, Wise, VA

Dean Watts Park - Seal Coating Project - 2021
Infrastructure
Bidding
Bardstown, KY 40004

Road Resurfacing and Minor Repairs for Fiscal Year 2020
Post-Bid
Louisville, KY 40232

West Main Street (US 25) Streetscape
Post-Bid
Richmond, KY 40475

Preformed Thermoplastic Airfield Pavement Marking Installation
Results
Erlanger, KY

Resurfacing Ralph Mussman Recreation Complex
Results
Newport, KY

Road Stabilization
Post-Bid
Williamsburg, KY 40769

DPW - FY 2020-21 CDBG and Capital Street Resurfacing Project
Results
Covington, KY

Chip Seal of County Roads
Post-Bid
KY

Walton Verona Athletic Complex Paving 2020
Results
Walton, KY

Wilbers Road Reconstruction
Post-Bid
Less than $350,000 est. value
Fort Thomas, KY 41075

High Friction Surface Treatment,Beemon and Conrad Lane
Results
Burlington, KY 41005

Grace Avenue Stormwater and Street Improvements Project
Infrastructure
Post-Bid
Fort Mitchell, KY 41017

Joint/Crack Sealing
Term Contract
Results
Burlington, KY

Last Updated 08/23/2021 11:14 AM
Project Title

Asphalt Resurfacing - KY 21 and US 25

Physical Address View project details and contacts
City, State (County) KY   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Madison County 076gr21p083 - Fd05 & Fd52 Ky 21 And Us 25 In Madison County The Dbe Participation Goal Is 9.50%. Madison County Fd05 076 0021 009-010 : Paint Lick Road/Chestnut Street (Ky 21) (Mp 8.610) Beginning 0.106 Miles East Of Old Wallaceton Road Extending East To Us 25. (Mp 9.560), a Distance Of 0.95 Miles. Asphalt Resurfacing. Madison County Stp 9040(050) : Chestnut Street/Richmond Road North (Us 25) (Mp 2.863) Beginning At Ky 21 Extending North To The Pavement Joint 0.061 Miles South Of Ellipse Street. (Mp 4.576), a Distance Of 1.71 Miles. Asphalt Resurfacing. Syp No. 07-20043.00.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents