Similar Projects
Phase 2 Grading and Drainage Improvements Cozy Point Ranch
Infrastructure
Bidding
$400,000 CJ est. value
Snowmass Village, CO 81615

Fleet Shop Fluid Room Renovations
Renovation
Bidding
$195,000 CJ est. value
Lakewood, CO 80215

Boettcher Concert Hall Audio System Integration
Renovation
Sub-Bidding
$400,000 CJ est. value
Denver, CO 80202

Street Condition Distress Assessment-5-Year Pavement Management Plan
Term Contract
Sub-Bidding
Severance, CO 80550

Concrete Contractors for Pouring Concrete Slabs at the Alamosa K-2 Elementary School
Post-Bid
Alamosa, CO 81101

Construct Vehicle Storage for High-Altitude Army Aviation Training Site (HAATS)
New Construction, Infrastructure - 6,191 SF
Post-Bid
$1,700,000 CJ est. value
Gypsum, CO 81637

NCCWTP Concrete Repairs
Results
$100,000 to $130,000 est. value
Denver, CO

Operations On-Call Concrete Replacement and Repair
Alteration
Results
Lafayette, CO

2023 Paving Program
Infrastructure
Construction
$760,000 CJ est. value
Firestone, CO 80520

RFP D/B- Main Street Lighting Project
Infrastructure
Bidding
$200,000 CJ est. value
Lyons, CO 80540

Various Concrete Projects/Repairs
Alteration
Post-Bid
CO

Precast Foundations
Alteration
Results
Fort Collins, CO

Waterline Restraint Rehabilitation 2023
Infrastructure
Bidding
$500,000 CJ est. value
Rifle, CO 81650

Concrete Repairs and Replacement Services
Term Contract
Post-Bid
Westminster, CO

Canvas Stadium Concourse Sealing
Alteration
Results
Fort Collins, CO 80523

Last Updated 05/06/2023 05:34 PM
Project Title

Construction Services for the Flatirons Campus Control Facility

Physical Address View project details and contacts
City, State (County) Golden, CO 80403   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

NREL intends on issuing a Request for Proposal within the next 60-90 days of this notice and will request small business industry interests through the submission of a resumes and capability statements. Detailed requirements will be included in the posting. If your organization would like to submit a capability statement, please submit to the point of contact below or submit as an interested organization as directed herein. Please specify your experience with projects ranging from $1,000,000.00 to $10,000,000.00. The National Renewable Energy Laboratory (NREL) is a national laboratory owned by the U.S. Department of Energy (DOE). NREL is the only federal laboratory dedicated to research, development, commercialization, and deployment of renewable energy and energy efficiency technologies. NREL is managed and operated for DOE's Office of Energy Efficiency and Renewable Energy by The Alliance for Sustainable Energy (Alliance), the "M&O Contractor." Over the past several years the research mission at the National Renewable Energy Laboratory's (NREL) Flatirons Campus (FC) has expanded to include multiple renewable energy technologies and the integration of the technologies into the electrical grid. Recently, the mission has grown to include DOE's Integrated Electrical Systems at Scale (IESS) initiative. With all of these new technologies being integrated with each other and with the site being connected to other NREL, DOE and academic campuses through IESS, the FC needs a new facility to support the management, data collection and coordination of these research assets. NREL's new FC Control Center Facility (CCF) will be focused on operational control and monitoring of IESS research projects utilizing research assets at the Flatirons Campus as well as at NREL's Energy Systems Integration Facility (ESIF) (at the South Table Mountain Campus) and at other national labs, universities, and other research institutions around the world. The CCF will provide computing and data visualization capabilities to support research data acquisition, analysis, and visualization as integrated real-time experiments are conducted across multiple sites. Description of Work: The CCF will be an 8,000-sf two-story building with a control room, a data center, conference rooms, a 2-D visualization room, and support spaces. The building will be located north of the main road and east of the 5 MW Dyno building. The FC site and utilities will be expanded to support the new building. The project includes a parking lot, driveway, sidewalks, landscaping, a detention pond and an onsite wastewater treatment system (OWTS) along with other site improvements. The objective of this Subcontract is to fully and safely construct the new building at the FC designed and described in the design specifications documents. An EPA Construction General Permit and Stormwater Pollution Prevention Plan will be required to be obtained, maintained and closed by the Subcontractor as required by the construction documents. Submittals shall be provided in electronic version for NREL's use and records. The Subcontractor will establish and maintain its own Document Control System (DCS) database for electronically storing Quality Assurance inspection and testing data and tracking submittals including substantiation submittals. Database will be structured so NREL's added information will not be overwritten or deleted by incorporation. Backup, security controls, and offsite location is required for the DCS. A new Onsite Wastewater Treatment System is included in the scope of work to provide sanitary sewer service to the CCF. The design documents for the OWTS are provided in Exhibit H. The wastewater treatment system permit from Jefferson County will be obtained by the design team. Commissioning for the system is to be performed by the Subcontractor. Provide a separate cost proposal for this scope of work. Location: Offerors shall have a bona-fide office located within 50 miles of NREL's Flatirons Campus or shall be able to demonstrate their capability to perform in these areas: National Renewable Energy Laboratory (NREL) Flatirons Campus Laboratories and Offices 19001 W. 119th Avenue Arvada, CO 80007 Other Requirements: This procurement is issued as a competitive solicitation. A bidders list will not be publicly distributed. Respondents to this solicitation notice will be given access to the project specification documents upon receipt of the Notice of Intent to Propose. No subcontract award will be made to any contractor that is not registered or in the process of registering with the System for Award Management (SAM). Please visit the SAM website at https://sam.gov/content/entity-registration for instructions on how to register. *Some or all of the documents for this project may be controlled unclassified information and property of the United States Government and if so we will not be obtaining them. Users must register with Beta.Sam in order to view and obtain controlled unclassified documents. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

2 Stories Above Grade, 8,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents