Similar Projects
Last Updated | 05/26/2022 11:38 PM |
Project Title | Clark Regional Wastewater District - Phase 5B Project Package 2 - Salmon Creek Treatment Plant Secondary Treatment Process Improvement |
Physical Address | View project details and contacts |
City, State (County) | Vancouver, WA 98685 (Clark County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,729,709 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This is a service / maintenance or supply contract in Vancouver, Washington. Contact the soliciting agency for additional information.Salmon Creek Treatment Plant Equipment and Materials for the Phase 5B Package 2 Secondary Treatment Process Improvements Project Discovery Clean Water Alliance for the Equipment and Materials for the Phase 5B Package 2-Secondary Treatment Process Improvements Project; Discovery Clean Water Alliance Project No. 92-2017-0053. The Project contemplated consists of: 120-foot diameter secondary clarifier mechanism, suction duct type. Two (2) 100 hp, 12-inch return activated sludge pumps. Motor Control Center (MCC) and Adjustable Frequency Drives (AFDs). Process Piping Materials: Cement-lined ductile iron, and welded steel piping (8-inch, 18-inch, and 36-inch diameter). Process Valves: Plug valves (8-inch through 24-inch); swing check valves (16-inch). Interim milestones apply to equipment and materials as specified. The Project will be completed in all respects on or before the following dates: Secondary Clarifier Mechanism Center Column Anchor Bolts and Anchor Bolt Template: July 15, 2022. Secondary Clarifier Mechanism: January 31, 2023. Two (2) RAS Pumps: March 31, 2023. MCC Section and AFDs: March 31, 2023. 36-inch ML, 18-inch RAS, and 8-inch WAS/PD Process Piping Materials Under Secondary Clarifier 5: July 15, 2022. All Other Process Piping Materials and Valves: December 30, 2022. Total sq ft for project not available at this time. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details | Water Treatment Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |