Similar Projects
Last Updated | 10/29/2021 02:46 AM |
Project Title | Rehabilitation of the Existing Wastewater Collection |
Physical Address | View project details and contacts |
City, State (County) | MT (Mineral County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Rehabilitation of the existing wastewater collection and treatment system on the Dena Mora Rest Area Rehab project located in Mineral County. The project is located on the east and west sides of Interstate Route 90 between RP 4.6 and RP 4.7. Work includes replacement of septic tanks, pipes and lining of tanks Section No. 0001 - Rehab Rest Area 104030010 Miscellaneous Work 20,000.000 Unit 104030025 Miscellaneous Items-install 2.000 Each 104030035 Miscellaneous Items-repair 1.000 Ls 104030070 Miscellaneous Items-removal 1.000 Ls 105070000 Contractor Survey and Layout 1.000 Ls 109200005 Mobilization 1.000 Ls 208010150 Temporary Erosion Control-ls 1.000 Ls 208010200 Temporary Erosion Control-fixed 500.000 Unit 603013460 Pipe-pvc 6 in Sanitary 210.000 Lnft 603013670 Ductile Iron Pipe 4 in 5.000 Lnft 603017030 Dewatering 1.000 Ls 608010020 Sidewalk-concrete 4 in 3.000 Sqyd 610100559 Revegetation 1.000 Ls 610501060 Rehabilitate Building 1.000 Ls 610513200 Building - Misc 1.000 Ls 618030015 Traffic Control-fixed 500.000 Unit 618030080 Traffic Control-ls 1.000 Ls |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |