Similar Projects
New Addition to an Existing Nursing Facility
Addition, Demolition, Infrastructure
Design
$2,500,000 CJ est. value
Bellefontaine, OH 43311

Roadway Minor Rehab - SR 235
Infrastructure
Design
$2,389,057 CJ est. value
Belle Center, OH 43310

Logan Acres Memory Care Expansion
Addition, Demolition, Infrastructure
Bidding
Bellefontaine, OH 43311

DeGraff Water Treatment Plant Replacement
Infrastructure
Bidding
$1,225,000 CJ est. value
De Graff, OH 43318

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Lakeview Fire Station Access Drive Improvements
Infrastructure
Results
$101,500 est. value
Lakeview, OH

Two Lane Resurfacing - LOG-Pave-FY2022
Infrastructure
Results
De Graff, Huntsville, OH

Lakeview Meadows MHP - Park Expansion
Addition, Infrastructure - 2,997,013 SF
Construction
Lakeview, OH 43331

Mixed-Use Development / Middleburg Heights
Demolition, New Construction, Infrastructure
Construction
$1,500,000 CJ est. value
Middleburg Heights, OH 44130

Bridge Preservation - SR 273
Demolition, New Construction, Infrastructure
Design
$1,248,307 CJ est. value
Rushsylvania, OH 43347

Repair of Roadway Surface
Infrastructure
Post-Bid
Bellefontaine, OH

Mcdonald TR55 Hot Mix Paving Project
Infrastructure
Results
$103,056 est. value
Belle Center, OH

Asphalt Paving, Seal Coating, Rubberized Crack Filling, and Striping of Parking Lots
Infrastructure
Post-Bid
Bellefontaine, OH 43311

Mcdonald TR180 Widening and Cold Mix Paving Project
Infrastructure
Results
Belle Center, OH

Last Updated 04/28/2023 03:06 PM
Project Title

Columbus Street Reconstruction Phase 2

Physical Address View project details and contacts
City, State (County) West Liberty, OH 43357   (Logan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $788,974 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Columbus Street Reconstruction Phase 2 Substantial Completion Date: November 11, 2023 The reconstruction of Columbus Street from Park to Reynolds Street including curb and gutter and storm sewer. Question Deadline 03/24/2023 Questions received less than 4 days prior to the date for opening of Bids may not be answered. Bidder must submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Email Project Manager, (Michael K. Goettemoeller), (mkg@choiceoneengineering.com). If no response within 24 hours call (937-497-0200).

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents