Similar Projects
West WWTP Expansion - PH I
Addition
Conception
$1,200,000 est. value
Sugar Land, TX

East Wastewater Treatment Plant
New Construction
Conception
Richmond, TX

TBWWTP Expansion, Phase II
Addition
Design
$28,820,000 est. value
Temple, TX 76502

Dallas Salmon Wastewater Treatment Plant Operations Center
New Construction - 10,000 SF
Design
$5,003,625 est. value
League City, TX 77573

Wastewater Treatment Plant Nos. 1 and 2 Centrifuge and Blower Rehabilitation
Renovation
Bidding
Sugar Land, TX

Sludge Drying Bed Gates
Renovation
Bidding
Iredell, TX

Waste Water Treatment Plant Improvements
Post-Bid
La Feria, TX 78559

Wastewater Treatment Plant Rehabilitation and Lift Station Conversion
Post-Bid
$1,365,000 est. value
Katy, TX 77449

Wastewater Treatment Plant Phase 1
Results
Less than $2,139,671 est. value
TX

Salitrillo Wastewater Treatment Plant Progressive Design Build Upgrades
Results
Less than $25,000,000 est. value
San Antonio, TX 78204

Northwest Sludge Processing Facility
New Construction
Pending Verification
Copperas Cove, TX 76522

Northwest Wastewater Treatment Plant Office/Lab Construction
New Construction
Pending Verification
Copperas Cove, TX 76522

Steven M. Clouse WRC Digester Mixing and System Enhancements Phase 3 Project
New Construction
Bidding
$24,573,000 est. value
San Antonio, TX 78221

Roberto R. Bustamante Wastewater Treatment Plant - Digester No. 2 Rehabilitation
Post-Bid
El Paso, TX 79925

Dissolve Air Floatation Unit and Support Replacement
Results
Less than $299,000 est. value
San Antonio, TX 78200

Last Updated 01/18/2022 12:02 PM
Project Title

Wildhorse Ranch Wastewater Treatment Plant Expansion

Physical Address View project details and contacts
City, State (County) Austin, TX 78653   (Travis County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Master Planning, Bidding Expected March 2022
Bids Due View project details and contacts
Estimated Value $35,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Due to increasing growth in Austin and Manor as well as the diversion of the Harris Branch WWTP and future diversion of Dessau WWTP flows to Wild Horse Ranch Wastewater Treatment Plant (WWTP), the plantâ¿¿s existing capacity of 0.75 MGD.

Details

Sewage Treatment Plant, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents