Similar Projects
Marion Aquatic Center
New Construction
Conception
$22,000,000 to $27,000,000 est. value
Marion, IA

Bedell Family Ymca - Indoor Pool Improvements
Renovation, Alteration
Post-Bid
Spirit Lake, IA 51360

Indoor Pool Sandblasting and Painting
Infrastructure, Alteration
Post-Bid
Coralville, IA 52241

Hartley Community Pool
Infrastructure
Results
Hartley, IA

Valley View Aquatic Center Lazy River Repainting
Alteration
Results
West Des Moines, IA 50266

Pool & Athletic Facility Construction
New Construction - 61,000 SF
Pending Verification
$33,000,000 est. value
Waukee, IA

2021 Prairie Ridge Aquatic Center - Resurfacing
Infrastructure
Results
$175,000 est. value
Ankeny, IA

Replacement of Deteriorated Slide Tower Handrails at Two
Infrastructure
Results
Cedar Rapids, IA 52405

Aquatic Facility
Renovation
Results
IA

Ackley Municipal Wading Pool
Infrastructure
Results
$251,240 est. value
Ackley, IA 50601

Waukee CSD Aquatics Facility
Infrastructure
Results
Waukee, IA 50263

Lazy River Feature Replacement
Infrastructure
Results
West Des Moines, IA 50266

Cork Hill and Dohse Splash Parks
Infrastructure
Results
Davenport, IA 52803

New Indoor Aquatic Center
Infrastructure
Results
$31,200,000 est. value
Ames, IA 50010

Nevada Field House 2022
New Construction, Infrastructure - 55,000 SF
Results
$7,387,000 est. value
Nevada, IA 50201

Last Updated 04/26/2022 04:46 PM
Project Title

Community Pool

Physical Address View project details and contacts
City, State (County) Rock Valley, IA   (Sioux County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new outdoor swimming pool, a new filter building, and a renovated bathhouse consisting of a swimming pool having a water surface area of 5,700 sq. ft. Water features include an enclosed flume water slide, one-meter springboard diving, water spray features, family slide, and other related items. Building structures include a 2,500 sqft. bathhouse and a 800 sq. ft. filter building. Site work includes walks, fencing, concrete deck, and other site related work.

Details

9,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents