Similar Projects
NASCAR Speedway Commerce Center Business Park / Lincoln
New Construction, Infrastructure - 3,000,000 SF
Conception
$640,000,000 CJ est. value
Lincoln, AL 35096

The Star Uptown / Carraway Hospital Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Design
$300,000,000 CJ est. value
Birmingham, AL 35234

Welcome Center Replacement (Site Construction/Grading, Drainage, Pavement, Lighting, and Structures) on I-65
Infrastructure
Bidding
$5,929,000 CJ est. value
Athens, AL 35613

Lee Road 296 Paving Improvements
Infrastructure
Post-Bid
Smiths Station, AL 36877

Transit Transfer Station
New Construction, Infrastructure
Post-Bid
$15,677,228 CJ est. value
Huntsville, AL 35801

Old Highway 43 - RRR
Results
AL

Texas Street Infrastructure Rehabilitation
Results
$5,578,877 est. value
Mobile, AL 36628

Graduate Hotel / Auburn
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Auburn, AL 36830

Circle K - Road Improvements and Convenience Store
New Construction, Alteration - 5,533 SF
Construction
Huntsville, AL 35810

National Chain Retail Store - Reveille's Outpost / Auburn
New Construction, Infrastructure - 9,500 SF
Pending Verification
$2,000,000 CJ est. value
Auburn, AL 36832

Resurfacing and Drainage Repair
Infrastructure
Post-Bid
$800,000 est. value
Slocomb, AL

Reliance Fire Access Road
Results
$517,305 est. value
Cullman, AL

Paving for Various Walker County Schools
Infrastructure
Post-Bid
AL

Orange Beach High School Turnout
Infrastructure
Results
$58,891 est. value
Orange Beach, AL 36561

Kroger U-606 / Madison
Demolition, Infrastructure, Build-out, Renovation - 89,892 SF
Post-Bid
$2,500,000 CJ est. value
Madison, AL 35758

Last Updated 01/31/2023 08:08 AM
Project Title

Curb and Ramp Installations on SR-4, SR-7, SR-23, SR-25, SR-53, SR-75, and SR-144 at Various Locations

Physical Address View project details and contacts
City, State (County) Rosa, AL 35121   (Blount County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,013,207 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties : Blount and St. Clair Constructing the Curb and Ramp Installations on SR-4, SR-7, SR-23, SR-25, SR-53, SR-75, and SR-144 at various locations in the East Central Region (Birmingham Area) as indicated in the plans. The Bracket Estimate on this project is from $876,487 to $1,071,262 . Contract Time: 150 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 004 - Curb and Ramp Installations on SR-4, SR-7, SR-23, SR-25, SR-53, SR-75, and SR-144 at Various Locations *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents