Similar Projects
Last Updated | 12/12/2019 12:00 PM |
Project Title | Trap Rock Water Treatment Facility Maintenance Building and Thickener Pump Station HVAC Modifications |
Physical Address | View project details and contacts |
City, State (County) | Leesburg, VA 20175 (Loudoun County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency - 08/30/19 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work to be completed under this contract primarily consists of the installation of the equipment listed on the HVAC schedules on drawing no. HD-1. The work also includes some demolition, ductwork installation, fire panel modifications, electrical modifications for the new equipment and testing, adjusting and balancing (TAB) of the HVAC systems. Some minor architectural/structural modifications are required in support of the HVAC modifications such as roof penetrations which require membrane roofing repairs, gypsum board installation, and joint sealing. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |