Similar Projects
In-N-Out Burger
New Construction - 4,000 SF
Conception
$500,000 to $1,000,000 CJ est. value
Boise, ID

In-N-Out Burger
New Construction - 3,879 SF
Conception
$500,000 to $1,000,000 CJ est. value
Meridian, ID 83642

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

McDonalds
New Construction - 4,268 SF
Post-Bid
$1,000,000 to $5,000,000 est. value
Star, ID 83669

Prime Earth Pit Reclamation
Infrastructure
Post-Bid
Eagle, ID 83616

Downtown Library Improvements
Renovation
Results
$7,000,000 est. value
Boise, ID 83702

Julia Davis Park Roadway and Greenbelt Renovations
Infrastructure
Results
$800,000 est. value
Boise, ID 83702

Bodo Block Food Hall
Renovation - 100,000 SF
Construction
$10,000,000 to $20,000,000 est. value
Boise, ID 83702

Greater Boise Aquatics Centre
New Construction - 38,700 SF
Construction
$12,000,000 est. value
Boise, ID 83705

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

3100 Cellars
New Construction - 8,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Boise, ID

Julia Davis River Node Memorial Construction
Infrastructure
Design
$600,000 CJ est. value
Boise, ID 83702

Spring Valley Phase 1 Grading
Infrastructure
Post-Bid
$300,000 est. value
Eagle, ID

Last Updated 06/21/2023 03:44 PM
Project Title

Collister Elementary School Addition

Physical Address View project details and contacts
City, State (County) Boise, ID 83703   (Ada County)
Category(s) Commercial, Education, Entertainment/Recreation, Government/Public, Heavy and Highway
Sub-Category(s) Athletic Facility, Elementary School, Food/Beverage Service, Library - Public, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $5,400,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 21, 2023, this project has started construction.

Details

2 Stories Above Grade, 25,500 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Earth Moving, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents