Similar Projects
Alligerville Fire House
Addition
Design
High Falls, NY 12440

NEQALS Ambulance Building
New Construction - 11,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Webster, NY 14580

Binghamton Fire Station
New Construction
Bidding
$800,000 to $5,500,000 est. value
Binghamton, NY 13901

Construction of a Steel Building - New Slate Hill Fire House
New Construction - 12,800 SF
Post-Bid
Less than $2,500,000 est. value
Slate Hill, NY 10973

Waterford Consolidated Firehouse
Term Contract
Post-Bid
Waterford, NY

Additions and Alterations at Green Street Fire Station
Addition
Results
$4,000,000 to $4,500,000 est. value
Mount Kisco, NY 10549

Town of Cairo Ambulance Project
Results
Cairo, NY 12413

Weaver Street Fire Station
Construction
Less than $1,300,000 est. value
Larchmont, NY 11791.

Nichols Fire Station Addition and Renovations
Renovation, Addition, Term Contract
Construction
$3,000,000 to $4,000,000 est. value
Nichols, NY 13812

Z1DA--528A5-17-526 Fire Department Upgrades
Renovation
Design
$1,000,000 to $5,000,000 est. value
Canandaigua, NY 14424

Improvements to Fire Stations 1, 2 and 4
Post-Bid
Schenectady, NY

Improvements to Fire Station 3
Results
Less than $750,000 est. value
Schenectady, NY 12301

Waterford Fire Station at 8th Street
Construction
Waterford, NY 12188

Middlehope Shower Room and Miscellaneous Repair Work
Post-Bid
Less than $35,000 est. value
Newburgh, NY 12550

Port Dickerson Fire Station Addition to 3-Bay Garage
Addition
Results
Less than $175,000 est. value
Binghamton, NY 13901

Last Updated 06/23/2021 08:37 AM
Project Title

Fire Station 12 Rehabilitation

Physical Address View project details and contacts
City, State (County) Yonkers, NY 10701   (Westchester County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish all labor, materials and equipment to complete the rehabilitation of Fire Station No. 12, as indicated on the contract documents. This project generally consists of the following work components: A. Filing of all permits required for the work; B. Installation, maintenance and removal of scaffolding, pedestrian protection structures and worker safety measures; C. Installation, maintenance and removal of temporary shoring and other structural supports; D. Professional Engineering Services to support the work of the Contractor; E. Repair existing building/chimney elements identified on the plans; F. Miscellaneous additional work as may be required.

Details

Fire/Police Station, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents