Similar Projects
USACE Cedar Lake Pump Station
Conception
$23,300,000 est. value
Cedar Rapids, IA 52407

Water & Resource Recovery Center - RAS Pump Replacement - City of Dubuque
Renovation
Conception
$880,000 est. value
Dubuque, IA 52003

Municipal Water Well Improvements Rebid
Infrastructure
Design
$1,131,320 CJ est. value
Dayton, IA 50530

SE 9th Street Stormwater Pumping Facility - City of Des Moines
New Construction, Infrastructure
Design
$7,500,000 CJ est. value
Des Moines, IA 50309

SE Des Moines Remedial Works - Pump Station Rehabilitation
Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Des Moines, IA 50315

Storm Water Improvements 2022
Infrastructure, Renovation
Bidding
$300,000 CJ est. value
Maquoketa, IA 52060

City of Newton 2022 Roofing Project No. 1
Renovation
Sub-Bidding
$300,000 CJ est. value
Newton, IA 50208

Mount Pleasant Northeast Lagoon Conversion
New Construction, Infrastructure
Post-Bid
Mount Pleasant, IA

Sheldon Water Tower
New Construction, Infrastructure - 1,100 SF
Post-Bid
$3,600,000 to $3,800,000 est. value
Hospers, IA 51238

Meter Buildings
Renovation
Results
$1,800,000 to $2,250,000 est. value
Hull, Sioux Center, IA - Beresford, SD

Auburn Court Lift Station Abandonment
New Construction, Infrastructure
Results
Bettendorf, IA

Lift Station #3 Upgrades - Phase 2
Renovation
Conception
$255,000 est. value
Waukee, IA

Hull Pump Station and Sheldon Meter Building Project
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Hull, IA 51239

Lift Station Improvements
Renovation
Post-Bid
$550,000 est. value
Rockwell City, IA 50579

Main Lift Pump Station Emergency Repairs
Renovation
Results
Davenport, IA 52802

Last Updated 08/02/2022 09:31 AM
Project Title

Raccoon River Stormwater Pump Station Controls Replacement Project

Physical Address View project details and contacts
City, State (County) WDM, IA 50265   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $437,020 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A. The Work of Project is defined by the Contract Documents and consists of the following: 1. The Project consists of the Work at the Raccoon River Storm water Management Pump station at the location listed above. The project requires the disconnection of the existing motor control center and associated devices and the installation of a new Motor Control, center for the facility and reconnection of associated pumps to new Motor Control Center. The scop of work also includes a new PLC based control panel with HDMI screen and reconnection to associated control devices as shown within the contract documents. B. Type of Contract: 1. Project will be constructed under a single prime contract. All work is to be done in strict compliance with the Plans and Specifications prepared by Resource Consulting Engineers which have been heretofore approved by the City Council and which are now on file for public examination in the office of the City Clerk. The extent of work on this project is the furnishing of all labor, equipment, and materials for the construction of improvements generally described as follows: Replacement of existing motor control center and pump control panel. The kinds of materials, estimated quantities, and work to be done for the project on which bids will be received are as shown on the bid proposal for said project. All work is to be done in strict compliance with the Plans and Specifications prepared by Resource Consulting Engineers which have been heretofore approved by the City Council and which are now on file for public examination in the office of the City Clerk. The City Council of West Des Moines, Iowa, will hold a public hearing on the proposed Plans, Specifications, Form of Contract, and Estimate of Costs for the construction of said improvements at 5:35 p.m. on August 1, 2022 in the Council Chambers, 4200 Mills Civic Parkway, West Des Moines. At said hearing, any interested person may appear and file objections thereto or to the cost of the improvements. All bids shall be made on a form furnished by the City and shall be filed on or before the time specified above, in a sealed envelope addressed to the City Clerk of West Des Moines, Iowa, clearly stating that the envelope contains a bid on this project. Each proposal shall be accompanied by a bid bond, a cashiers or certified check drawn on an Iowa bank or a bank chartered under the laws of the United States in an amount equal to ten percent (10%) of the total amount of the bid. If a bid bond is submitted it must be on the form provided with the contract documents. The bid security submitted should be made payable to the City of West Des Moines, Iowa, and not contain any conditions either in the body or as an endorsement thereon. This bid security is provided to the City of West Des Moines as security that if the bidder is awarded the contract by the City, the bidder will enter into a contract on the form provided by the City at prices bid and shall furnish the required performance and payment bond to the City. If the bidder fails to execute the contract and to furnish an acceptable performance and payment bond or provide a Certificate of Insurance within ten (10) days after acceptance of the bid by the City, the bid security may be forfeited or cashed by the City as liquidated damages. The successful bidder will be required to furnish a performance and payment bond in the amount of one hundred percent (100%) of the contract price guaranteeing faithful performance of the contract and guaranteeing payment to all persons supplying labor and/or materials in the execution of the work provided for in the contract. Additionally the contractor must provide the City with a guarantee of maintenance of said improvement in the form of surety for a period of one (1) year from the time of acceptance by the City. By virtue of statutory authority preference will be given to products and provisions grown and coal produced within the State of Iowa and to Iowa domestic labor. Work on said project shall commence within ten (10) days of the written notice to proceed and shall be completed by August 1, 2023. Liquidated damages in the amount of Two-hundred Fifty dollars ($250.00) per day will be assessed for each day that the work remains uncompleted after the end of the contract period. Payment for the work will be made by the City in cash from such funds as may be legally available including cash on hand, proceeds from the sale and issuance of General Obligation Bonds and such other funds including the proceeds from the sale and issuance of such other bonds as may lawfully be issued as the City Council may at its sole discretion determine and provide. Payment will be made to the contractor based on monthly estimates in amounts equal to ninety-five (95%) percent of the contract value of the work completed during the preceding calendar month, and will be based upon an estimate prepared by the Contractor on the first day of the month, subject to the approval of the Engineer. Any such payment by the City shall in no way be construed as an act of acceptance for any part of the work partially or totally completed. Final payment by the City will be made in accordance with Iowa statues and the contract documents. The City reserves the right to reject any and/or all bids and to waive any and/or all technicalities and/or all irregularities.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents