Similar Projects
Cannon Road Lift Station Improvements - City of Carlsbad
Renovation
Conception
$565,000 CJ est. value
Carlsbad, CA 92008

Moonlight Beach Pump Station Rehabilitation - CE22D - City of Encinitas
Renovation, Infrastructure
Conception
$1,500,000 CJ est. value
Encinitas, CA 92024

NCWRP Expansion and Influent Pump Station and Pipeline- Package 1 Flow Equalization
Addition, Demolition, Renovation, Infrastructure
Design
$9,760,000 CJ est. value
San Diego, CA 92121

Storm Water Diversion at the South Bay Water Reclamation Plant
Demolition, New Construction, Infrastructure
Bidding
$2,940,000 CJ est. value
San Diego, CA 92154

Live Oak Springs Water System Improvements Well No. 6
Infrastructure
Bidding
$620,000 CJ est. value
San Diego, CA 92101

Parker Pump Station Replacement
New Construction, Demolition
Post-Bid
$17,400,000 to $19,400,000 est. value
Coronado, CA

Lakeside Valve Station Replacement
Renovation
Post-Bid
$2,200,000 to $2,500,000 est. value
San Diego, CA

Sewage Lift Station Pump Maintenance
New Construction
Results
$330,000 est. value
Carlsbad, Huntington Beach, Laguna Beach, San Clemente, CA

E Reservoir Replacement And Pump Station Project
New Construction
Results
$12,350,000 est. value
Vista, CA

Motor Control Center Upgrades Pump Stations - City of Poway
Renovation
Conception
$715,000 CJ est. value
Poway, CA 92064

Chet Harritt Pump Station Replacement
Demolition, New Construction, Infrastructure
Bidding
$11,000,000 CJ est. value
La Mesa, CA 91942

Pump Station 1 and 2 Improvement and Modernization
Infrastructure
Post-Bid
$450,000 CJ est. value
San Diego, CA 92101

Owner Consultant for The Oceanside Mesa Garrison Force Main Progressive Design-Build
New Construction
Results
Oceanside, CA

Police Facility Sewer Pump Station Relocation - GGV0245 - City of Chula Vista
Renovation
Conception
$360,000 CJ est. value
Chula Vista, CA 91910

Lift Station Upgrades - 909953000722 - City of Oceanside
Renovation
Conception
$867,214 CJ est. value
Oceanside, CA 92054

Last Updated 09/27/2022 04:34 PM
Project Title

El Fuerte Lift Station Pump Addition - City of Carlsbad

Physical Address View project details and contacts
City, State (County) Carlsbad, CA 92008   (San Diego County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $830,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will add a third sewer lift pump for redundancy. City standards for lift stations require a redundant pump to allow for maintenance or an unplanned outage of existing pumps. As of September 27, 2022, this project is currently in the City of Carlsbad's FY 2022-2037 CIP. Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents