Similar Projects
Williamsburg Wetland Project
Infrastructure
Bidding
$643,581 est. value
Williamsburg, OH 45176

Ohio Wetland Restoration
Post-Bid
Ottawa, OH

Environmental Remediation Services (ERS)
Term Contract
Post-Bid
$47,000,000 est. value

Beaver Creek Restoration Design/Build
Results
Less than $838,340 est. value
Chardon, OH 44024

Woodhill Community Center Below Grade Waterproofing Leak Remediation
Results
$90,000 to $130,000 est. value
Cleveland, OH 44104

Environmental Remediation MAIDIQ (ERMA FY23)
Term Contract
Post-Bid

Howard Marsh Phase 2
Results
Less than $2,487,150 est. value
Curtice, OH 43412

Brooks Park Wetland Area Restoration Project
Results
Less than $526,200 est. value
Millersport, OH 43046

Wetland Restoration for Metroparks Toledo
Results
Less than $109,137 est. value
Maumee, OH 43537

Springbrook Garden Park Wetland Restoration Project Phase II
Results
$243,850 est. value
Mentor, OH

City of Bellefontaine Blue Jacket Creek Enclosure Project
Results
$334,866 est. value
Bellefontaine, OH

Mentor Marsh Salt Remediation Design/Build
Results
$12,000,000 est. value
Mentor, OH 44060

Black River AOC Remediation and Restoration Program - Seep Remediation System Improvements
Results
Lorain, OH

Nimisila Creek Preserve - Restoration Project
Results
Canal Fulton, Canton, OH 44614

Burntwood - Langenkamp Wetland Conservation Area
Alteration
Results
$1,250,000 est. value
Celina, OH 45822

Reported 11/30/2021 12:00 AM
Project Title

Swan Cleaners Remediation Project

Physical Address View project details and contacts
City, State (County) Mansfield, OH 44902   (Richland County)
Category(s) Environmental
Sub-Category(s) Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a sub-slab depressurization / vapor mitigation system in the building. This system will collect vapors from beneath the building and actively vent them above the building’s roofline to the atmosphere, thereby mitigating the vapor intrusion risk to indoor air for future occupants. B. Excavation and removal of impacted soils from the trenching operations for the vapor mitigation system, placement of granular backfill material within the excavation, and concrete replacement

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Subsurface Investigation, Water Remediation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Wetlands.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents