Similar Projects
Old Dominion Freight Line Warehouse Expansion
Addition
Conception
Saint Charles, MO 63301

Storage Building
New Construction
Conception
$1,000,000 est. value
Monroe City, MO

Self-Storage Facility
New Construction - 6,000 SF
Design
Springfield, MO 65810

Cornerstone Subdivision Lot C
New Construction, Addition - 6,560 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Saint Peters, MO

Rough Site Grading, Parking and Installation of Storm Water System for the A. Perry Philips Park Tennis/Pickleball Complex
Infrastructure
Bidding
Columbia, MO

Winghaven Boulevard Road Improvements Project
Infrastructure
Bidding
O Fallon, O'Fallon, MO 63368

EchoPark Conversion - St Louis
New Construction, Renovation - 57,569 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
Chesterfield, MO 63005

Spanish Pond ADA Improvements
New Construction
Post-Bid
MO 63138

Main Park and Heritage Park Sidewalk
Post-Bid
Washington, MO

Subdivision and Parking Lot Pavement Surface Preservation and Crack Seal
Results
$317,318 est. value
MO

Sidewalk Maintenance and Curb Ramp Construction
Term Contract
Results
$1,700,000 est. value
Springfield, MO

Amazon Sort Center
New Construction
Pending Verification
Berkeley, MO 63134

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Cargo Largo Retail Stores
New Construction - 531,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Independence, MO

Sewage Equipment Storage Building
New Construction
Bidding
Arnold, MO

Reported 10/14/2021 12:00 AM
Project Title

Parking Lot Addition and a Pre-Engineered Metal Building Shelter

Physical Address View project details and contacts
City, State (County) Centralia, MO   (Boone County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of a parking lot addition and a Pre-Engineered Metal Building Shelter.

Details

Warehouse/Storage, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents