Similar Projects
Boiler Cleaning Services-Multiple School Buildings
Term Contract
Bidding
Smithfield, RI 02828

Walk-In Cooler to be Installed at Cranston High School East
Alteration
Bidding
Cranston, RI 02910

Hot Water Tank Replacement Project
Post-Bid
$40,000 est. value
Burrillville, Harrisville, RI 02830

Boiler Replacements - DOT Smithfield Garage
Alteration
Post-Bid
Smithfield, RI 02917

Boiler Replacement at Crepeau Court and Street, Germain Manor
Results
Woonsocket, RI

Maintenance of Millipore Water System
Term Contract
Results
Providence, RI

Clayville Elementary School Boiler Replacement
Alteration
Post-Bid
Scituate, RI 02815

DOT Building Boiler Replacement
Results
Providence, RI 02903

Pure Water System Maintenance
Alteration
Post-Bid
Kingston, RI

NAVFAC D/B Building 95 Boiler Replacement NS
Term Contract
Results
$500,000 to $1,000,000 est. value
Newport, RI

Hot Water Heating System
Alteration
Post-Bid
Central Falls, RI 02863

Mechanical Service Contracts
Term Contract
Results
South Kingstown, RI

Water Heater Replacement Project
Alteration
Post-Bid
Providence, RI 02908

Two Building Management Systems (RTU Controls Boiler)
Alteration
Results
North Providence, RI

Steam Upgrades and Improvements - Fayerweather and Gorham Halls
Renovation
Post-Bid
Kingston, RI

Last Updated 03/23/2022 10:09 AM
Project Title

Boiler Replacement at Harbor View Manor

Physical Address View project details and contacts
City, State (County) East Providence, RI 02915   (Providence County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Work of this Contract comprises in general the total removal of the existing heating boiler system and domestic water heating system. The general scope of work shall include (but is not limited to) the contractor to furnish and install new space heating boilers, pumps, tanks, valves, piping and insulation required to provide a complete updated space heating boiler plant. The contractor shall also furnish and install a new domestic water heating system including heaters, pumps, tanks, valves, piping and insulation required to provide a complete updated domestic water heating system. In addition there will be new concrete pads installed and exterior insulated panels. Additional information is included on the drawings and within the specifications. Asbestos containing materials have been found within the space.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents