Similar Projects
Street Enhancements: Plaza Area along NW 16th Street
Infrastructure
Conception
$680,000 est. value
Yukon, OK 73099

Arterial Resurfacing: SW 104th Street from N Morgan Road to S County Line Road
Infrastructure
Conception
$550,000 est. value
Mustang, OK 73064

Intersection Modifications
Infrastructure
Design
$4,537,512 est. value
El Reno, OK 73036

Lake Trail Extension - Construction of a Reinforced Portland Cement Concrete Pavement
Infrastructure
Bidding
$80,000 CJ est. value
El Reno, OK 73036

Lake Trail Extension - Construction of a Reinforced Portland Cement Concrete Pavement
Infrastructure
Bidding
$80,000 CJ est. value
El Reno, OK 73036

Residential Street Resurfacing
Infrastructure
Post-Bid
$6,000,000 est. value
Oklahoma City, OK

Road Reconstruction Ash Road From Piedmont Street To Mustang and Arrowhead Road From Frisco to Cemetery
Infrastructure
Post-Bid
$700,000 CJ est. value
Piedmont, OK 73078

Pavement Rehabilitation (Asphalt)
Results
Geary, OK

Resurface (Asphalt) US-81: from 0.6 Miles North of the i-40 Business Junction, Extend North in El Reno
Results
El Reno, OK

200 North Yukon Parkway
New Construction, Infrastructure
Pending Verification
Yukon, OK 73099

South Side Drainage Improvements
Infrastructure
Bidding
$300,000 CJ est. value
El Reno, OK 73036

Starbucks #67956 / Yukon
New Construction, Infrastructure - 2,919 SF
Post-Bid
$700,000 CJ est. value
Yukon, OK 73099

Secondary Entry Road and Gate
Infrastructure, Alteration
Results
$685,676 est. value
Mustang, OK 73064

Street Resurfacing/Repair
Infrastructure
Results
$3,848,858 est. value
Oklahoma City, OK

Thin Overlay Resurfacing Unit Price Contract
Infrastructure
Results
$2,150,000 est. value
Oklahoma City, OK

Last Updated 08/04/2022 06:02 PM
Project Title

W. Forster Drive Roadway Reconstruction Project

Physical Address View project details and contacts
City, State (County) Mustang, OK 73064   (Canadian County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $298,644 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bids Must Be in a Sealed Envelope Marked With the Following Statement: W. Forster Drive Roadway Reconstruction Project This Project Consists of Furnishing All Required Materials, Supplies, Equipment, and Tools to Perform All Necessary Labor, for the Re-construction of Approximately 343 Feet of Roadway Including Storm System and Sidewalks. A Cashier's Check, Certified Check, or Surety Bond in Amount of Five Percent (5%) of the Bid Shall Accompany the Sealed Proposal of Each Bidder. Deposits Will Be Returned to the Unsuccessful Bidders. The City of Mustang Reserves the Right to Reject Any and All Bids.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents