Similar Projects
C1DA--VISN 21 Master Planning/Study A/E IDIQ
New Construction, Term Contract
Design
$50,000,000 to $100,000,000 est. value

RFP - DSA Project Inspector Services
Term Contract
Bidding
Orange, CA 92866

RFQ - Seniors Strategic Plan Development
Term Contract
Bidding
Irvine, CA 92606

Engineering, Planning and Development
Post-Bid

Indefinite-Delivery Indefinite-Quantity Architect-Engineer Contract; Mechanical, Electrical, Plumbing And Fire Protection; Navfac Sw
Term Contract
Post-Bid
$5,000 to $40,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Los Pinos Residential Center
Renovation, Alteration
Results
$30,000,000 est. value
Lake Elsinore, CA 92530

RFP - Material Testing and Inspection Services for Saddleback College at Advanced Technology and Education Park
Term Contract
Bidding
Tustin, CA 92782

Planning Services
New Construction, Infrastructure
Post-Bid
Laguna Woods, CA

RFP - Santa Ana Dog Park Design Services
Term Contract
Bidding
Santa Ana, CA 92701

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

RFP - Provide Electric Vehicle (EV) Charging Station Demand Response and Installation Services
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Anaheim, CA 92805

A-E IDIQ Surveying and Mapping
New Construction, Term Contract
Post-Bid
$10,000,000 est. value

RFP - On-Call Professional Project Management Services
Term Contract
Bidding
$300,000 CJ est. value
Newport Beach, CA 92663

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Last Updated 09/30/2022 06:33 PM
Project Title

RFP Design - Architectural Services Paal Center Ada Restroom Upgrades

Physical Address View project details and contacts
City, State (County) Santa Ana, CA 92704   (Orange County)
Category(s) Professional Services
Sub-Category(s) Architectural
Contracting Method Competitive Bids
Project Status Construction start expected October 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $175,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Online Q&A Yes Q&A Deadline 10/13/2022 2:00 PM (PDT) The project would remove architectural barriers that restrict access to those with disabilities and improve the existing restrooms within the community center to comply with the Americans with Disabilities act of 1990. In total, the project would rehabilitate four restrooms (two male and two female) consisting of removing existing plumbing fixtures , installing new fixtures with appropriate spacing , and updating the restrooms to provide an accessible path of travel to enter and exit the restrooms Contractors must provide costs of each of the service categories described in the specifications. Contractors must also list all deviations from specifications, if any. The routine maintenance locations will service as the basis for the RFP. At the discretion of the Projects Manager or designee, or more designee, one of more optional add-on locations and specialized services may or may not be included in the agreement with contractor. In addition, the City at the discretion of the Projects Manager or designee, reserves the right to decrease the scope of work during the duration of the agreement. All notifications, updates, and addenda will be posted on the City's bid management and publications system at portal. The City reserves the right to reject any and all bids and to waive any informality in any bid. The method of Contractor Selection has not been determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents